Skip to content

Sheet metal production and repeat supply

Plan the production route, tooling, lot traceability and delivery around your approved revision. Send your annual forecast and each order release quantity so KeepWin can quote the intended supply schedule.

Batch of sheet metal panels stored upright in a production rack
7–12 business daysPilot lot planning reference
2–3 weeksFirst production delivery reference
24–48 hDrawing change impact review

Choose a route by geometry, lot size and revision stability

Compare setup, material yield, tooling cost and finishing per release. Review die investment against the volume that can use the same revision.

Laser nesting and CNC bending

Review part nesting and shared cuts where edge quality allows. Use flexible tooling for several variants or revisions, with dedicated fixtures quoted where needed.

Turret forming and batch bending

For repeated holes, louvers or ribs, review tool fit and downstream bending datums. Compare changeovers and any dedicated local forming tools with the laser route.

Dedicated stamping die feasibility review

For frozen repeat designs, review strip layout, tool stations, maintenance and tryout. Confirm feasibility, ownership, first-article approval and the price over the agreed volume.

Examples of repeat production controls

5052-H32 clear-anodized enclosure

Retain the bend setup, grain direction and finish sample. Check appearance and verify grounding masks and mating points after anodizing.

SPCC coated structural brackets

Before a tooling change, compare rib and hole geometry. Approve the new first article and check coating allowance and fixture fit before batch release.

316L welded housings

Link material records to the shipment lot. Where sealing is specified, record test conditions and results and protect threaded ports and seams in transit.

Plan release quantities, lead time and delivery

Enter the annual forecast and quantity per order. Choose the drawing and feature status to identify a route for review.

Enter positive whole numbers for annual forecast and order quantity.

Quoted lead times depend on material, tooling approval, finish and inspection. Confirm the named place or port and the Incoterms® version separately in the order.

Compare costs for two production routes

Enter quoted setup and unit costs in the same currency. Use matching scopes for finish, inspection and delivery. The model assumes a single tooling charge per route and a fixed unit price.

Enter all four costs and an annual quantity to compare.

Lead times, order terms and change control

Sheet metal quoting, delivery and packaging
ItemCapability and conditions
Standard and complex assembly quotes4–12 h · 24–36 h
Cut/bend prototypes, then finished welded prototypes3–5 business days · 5–8 business days · 48–72 h
Pilot lots and production first deliveries50–500 pcs / 7–12 business days · 1,000–10,000+ pcs / 2–3 weeks
Prototypes and economical batch sizes1 pcs · 50–100 pcs
Protection for cosmetic surfaces and housingsPeelable film, EPE or cellular dividers, corner guards and braced plywood cases. Air or sea freight by project.

Quote using flat drawings, a STEP model and BOM where applicable. Rush timing depends on material, finish and queue.

Order controls and document handling
ItemCapability and conditions
Delivery terms by written agreementEXW, FCA, FOB, DAP or DDP may be agreed for suitable shipments. Confirm schedule, quantity tolerance, packaging and acceptance window in the order.
Written approval for substitutionsReview grade, source, condition and recycled content against the drawing. Submit data sheets, compliance evidence and engineering impact for written approval before a substitution.
Engineering and process changesReview customer drawing revisions in 24–48 hours, including stock, cost and first article impact. Agree notice window, verification and written release before major process changes.
NDA, access and recordsMutual NDA and restricted drawing access are available. Retention and destruction follow agreed project terms and regulatory requirements.

Materials for production and repeat supply

Compare grades and stock references. Record the approved surface condition, source and substitution rules in the production definition.

Aluminum alloys

Record alloy temper, grain direction and the finish sample.

5052-H32 · 6061-T6 · 1060-H24 · 3003 · 7075

0.5–10.0 mm

Carbon steel

Confirm the exact grade, coating specification and edge protection.

SPCC · DC01 · Q235B · SPHC · 65Mn

0.5–16.0 mm

Galvanized steel

Check coating designation and the condition after forming and joining.

SECC · SGCC · DX51D

0.5–16.0 mm

304 / 304L stainless steel

Keep the approved surface, sheet grade and joining method on the order.

304 / 1.4301 · 304L

304 · 0.4–12.0 mm

316 stainless steel

Verify the required grade and material certificate by lot.

316 / 1.4401

0.5–10.0 mm

316L stainless steel

Retain the low-carbon grade callout, weld procedure and traceability.

316L / 1.4404

0.5–8.0 mm

Copper and brass

Control temper and contact-face condition across lots.

T2 · C11000 · H62 · H65 · C5191

0.2–6.0 mm

Titanium sheet

Confirm grade, source and forming or joining qualification for the drawing.

Grade 2 · Grade 5 (Ti-6Al-4V)

Confirm from the drawing

Compare sheet material families

Choose at least two families for the comparison.

Control references, material lots and revision changes

Retain approved reference samples

Mark the part, drawing revision and approved appearance or fit on each reference sample. Agree storage and replacement conditions.

Track material lots and grain direction

Link sheet and finishing lots to the shipment. Record grade and condition, and preserve the specified grain orientation where it affects bending or appearance.

Approve revision changes with the correct gauge

Review stock and work in progress, track the new revision in the fixture or gauge plan, and obtain first-article approval before switching the batch.

Lot inspection and export packing

Sampling and process capability records

For AQL sampling, agree the standard edition, lot size, inspection level and limits by defect class. If Cpk is required, agree the feature and target and collect data from a stable process.

Surface protection, dividers and bracing

Use protective film, EPE or cellular dividers and corner guards as appropriate. Agree crate bracing and labels for the parts, lot and shipment method.

From approved drawing to repeat release

  1. Approve the drawing, route and release plan

    Confirm the drawing and BOM revisions, finish, tooling ownership and lot requirements.

  2. Trial tooling and approve the first article

    Check the intended tools and measurement plan. Agree the FAI or PPAP submission scope and approve the reference sample where needed.

  3. Produce and release traceable lots

    Link sheet, coating and inspection records to the lot. Release finished parts under the agreed sampling and acceptance plan.

  4. Replenish and manage changes

    Agree any buffer stock and split shipments. Review revision, stock and first-article impact for changes before releasing the next lot.

Request lot pricing and a delivery plan

Upload the approved STEP and PDF drawings or BOM. Specify the release quantity, target dates, packaging and acceptance plan. Arrange transfer of editable BOM files during engineering review.

Production and repeat supply brief

Quality documentation and agreements

Attach the batch plan or material comparison, or request quality documentation.

Contact and CAD files

Drawings & reference files

STEP/STP, PDF, JPG or PNG. Up to 3 files; 10 MB each, 20 MB total.

No files selected

    No drawing yet? Describe the part and application below.

    FAQs

    When should the prototype route be reviewed for production?

    Review changes in tools, material, bend radii, cut edges or finish. Approve the first part made under the intended production conditions.

    How do releases affect the annual price?

    Each release changes setup, nesting and finishing costs. Agree price tiers, minimum releases and any buffer stock arrangement in the order.

    What helps make reorders consistent?

    Controlled revisions, specified stock and finish, retained tooling decisions, relevant samples and an agreed inspection plan.

    KEEPWIN · LANGUAGE

    Choose your language

    Select the language you prefer for your visit.

    You can change your language anytime in the menu.