Multi-station fixtures and production feeding
A multi-station fixture can reduce load and unload time when parts share a datum and tool path. For suitable turned parts, assess bar feeding and collection against the required lot and inspection plan.
Plan repeat batches around an approved drawing, fixtures and inspection criteria. Coordinate machining, finishing and protected releases under one production plan.
Send CAD, a controlled drawing, initial lot and forecast. Ask for a quote that itemizes tooling, machining, finishing, inspection and packing.
Compare setup time, changeovers and repeatability against the forecast. Agree who owns, maintains and stores dedicated tooling in the quote.
A multi-station fixture can reduce load and unload time when parts share a datum and tool path. For suitable turned parts, assess bar feeding and collection against the required lot and inspection plan.
| Fixture or route | When to assess | Setup and cost factors |
|---|---|---|
| Standard vice or soft jaws | Prototype and validation lots · 1–50 pcs | Straightforward to adapt while the drawing changes. Check manual load time and locating consistency. |
| Multi-station quick-change tooling | After the design is frozen and repeat demand is known | Compare parts per setup, cycles, datum repeatability and amortization across planned releases. |
| Dedicated fixtures and gauges | Recurring production with agreed volume and controls | Review loading access, gauge validation, maintenance costs and the approved handover plan. |
Use these example geometries to identify which features need repeatable setups, treatment controls or inspection at lot release.
Locate multiple faces from the same datum where practical. Include cross-hole breakouts in the deburring plan.
Review bar-fed turning, tool wear and the matching shaft and bore fits. Keep material heats identifiable throughout the lot.
Define racking contact points and which threaded or locating features must be protected during anodizing.
Plan support during machining and define how parts are conditioned and measured after unclamping.
Use actual part geometry, setup and inspection time to reserve capacity. Agree the first release, forecast horizon and approval for any drawing or material change.
| Item | Capability and conditions |
|---|---|
| Typical monthly planning, smaller parts / complex multi-axis | 50,000–300,000 pcs · 3,000–25,000 pcs |
| Prototype and validation quantities | 1–50 pcs (EVT/DVT) |
| Economic lot, Swiss turning / multi-axis milling | 1,000–5,000+ pcs · 100–500+ pcs |
| Blanket orders and call-offs | Quarterly or annual agreements with weekly or biweekly releases. Review buffer stock and drawdown window, typically 3–6 months. |
| Dedicated fixtures and gauges | Customer-paid tooling assigned to the customer under the agreement. Identify, store, maintain, calibrate and transfer dedicated assets per the order. |
Planning capacity depends on programming, cycle time, part geometry and inspection. Confirm reserved volumes and delivery schedule in the quote.
| Item | Capability and conditions |
|---|---|
| Delivery terms by written agreement | EXW, FCA, FOB, DAP or DDP may be agreed for suitable shipments. Confirm schedule, quantity tolerance, packaging and acceptance window in the order. |
| Written approval for substitutions | Review grade, source, condition and recycled content against the drawing. Submit data sheets, compliance evidence and engineering impact for written approval before a substitution. |
| Engineering and process changes | Review customer drawing revisions in 24–48 hours, including stock, cost and first article impact. Agree notice window, verification and written release before major process changes. |
| NDA, access and records | Mutual NDA and restricted drawing access are available. Retention and destruction follow agreed project terms and regulatory requirements. |
Choose the inspections and records you need. The selections appear in your inquiry brief.
Set check frequency and recheck triggers for tool wear, fixture changeovers and shifts after finishing. Link lot and drawing revision to the release records.
| Item | Capability and conditions |
|---|---|
| Raw material and identification | MTR / EN 10204 3.1 · PMI |
| First article and dimensional reports | AS9102 FAI Form 1/2/3 · CMM · VMM |
| Production process capability | SPC / Cpk ≥1.33 · Cpk ≥1.67 |
| Finish reports and batch documentation | NSS · HRC / HV · Ra / Rz · COC · RoHS · REACH · CMRT |
| Supplier qualification documentation | Request applicable certificates by manufacturing entity and scope, calibration records and redacted report samples through the project audit. |
Agree CTQs, measurement system, sampling and stability first. Higher Cpk targets apply only to validated features.
Select up to four grades for comparison and the inquiry brief. If a different grade or stock condition is required, specify it on the drawing or in the project notes.
| Grade | Batch production checks | Finishing options | Lot release and traceability |
|---|---|---|---|
| 6061-T6 · Aluminum | Confirm T6 temper and support thin walls to preserve final dimensions. | Anodizing, conversion coating or as-machined condition. | Keep the temper and material lot identified. Sign off appearance and masked features when specified. |
| 7075-T6 · Aluminum | Confirm T6 stock condition and review corrosion exposure and any required finish. | Anodizing, conversion coating or as-machined condition. | Keep the temper and material lot identified. Sign off appearance and masked features when specified. |
| 304 · Stainless steel | Control tool wear and work hardening. Confirm that 304 matches the intended exposure. | Grade-specific passivation, electropolishing or mechanical finish. | Link the heat number to the part lot and confirm the finished surface. |
| 316 · Stainless steel | Review the service medium and track the specified 316 stock by heat. | Grade-specific passivation, electropolishing or mechanical finish. | Link the heat number to the part lot and confirm the finished surface. |
| 316L · Stainless steel | Verify the low-carbon grade against the certificate and keep it distinct from 316 through handling. | Grade-specific passivation, electropolishing or mechanical finish. | Link the heat number to the part lot and confirm the finished surface. |
| Grade 2 · Titanium | Confirm commercially pure titanium Grade 2 and review clamping at thin features. | As-machined, or specified coating or heat treatment after review. | Keep Grade 2 and Ti‑6Al‑4V Grade 5 separate from receipt to release. |
| Grade 5 (Ti-6Al-4V) · Titanium | Confirm the Ti‑6Al‑4V condition and review cutting heat, tool wear and finish. | As-machined, or specified coating or heat treatment after review. | Keep Grade 2 and Ti‑6Al‑4V Grade 5 separate from receipt to release. |
| 4140 · Carbon and alloy steel | Define heat-treated condition and leave finishing allowance where needed. | Heat treatment, grinding or protective coating by drawing | Verify specified hardness and fit after heat treatment. |
| C36000 · Brass | Confirm the stock grade and limits for the application and service fluid. | As-machined or plating per application | Track the stock lot and any applicable lead-content requirement. |
| POM · Engineering plastics | Define the exact POM grade, support slender sections and check dimensions after unclamping. | As-machined with edge treatment. Stress relief is evaluated by grade and geometry. | Identify each material lot and agree temperature and conditioning for final inspection. |
| PEEK · Engineering plastics | Identify the PEEK grade and any filler. Set the machining and inspection plan for that stock. | As-machined with edge treatment. Stress relief is evaluated by grade and geometry. | Identify each material lot and agree temperature and conditioning for final inspection. |
| PEI · Engineering plastics | Confirm the PEI grade and the conditioning required for dimension checks. | As-machined with edge treatment. Stress relief is evaluated by grade and geometry. | Identify each material lot and agree temperature and conditioning for final inspection. |
Choose at least two grades to compare them side by side.
Agree on the input, decision and release record at each stage. Use the approved revision and process baseline when planning repeat orders.
Use separated pockets, sleeves or corrosion protection as the application requires. Agree labels and shipment records, then schedule weekly or biweekly releases against the approved forecast.
Include your first lot, expected annual quantity and release cadence if known. Attach your selected grades and quality documents to the drawing inquiry.
Select materials or quality documents above.