Repeat-cavity mold
For a stable part design and repeat orders, evaluate extra cavities against press capacity, runner symmetry and inspection effort.
Plan cavity layout, fill balance and per-cavity inspection before cutting steel.
Send CAD, toleranced drawings, annual demand for each part number and the resin grade. We review how the parts share a tool and what to verify on the first trial.
A repeat-cavity tool makes the same part in every cavity. A family tool combines different parts. A hot runner can be evaluated with either layout.
For a stable part design and repeat orders, evaluate extra cavities against press capacity, runner symmetry and inspection effort.
Combine mating shells, buttons or clips where the resin, color and demand ratio fit a common shot. Review how changes or spare-part demand affect each part number.
Where the part calls for it, review temperature zones, gate sequencing and gate appearance. Compare runner waste and maintenance with a cold-runner design.
| Decision factor | Single-cavity mold | Repeat-cavity mold | Family mold |
|---|---|---|---|
| Demand stage | Early validation or frequent design changes | A stable single part number in repeat production | Different parts consumed together in known ratios |
| Resin and color | Independent runs can change resin or color per part | Same grade and color throughout one shot | All parts on a shared runner use the same resin and color |
| Filling and cooling | Tune to one part’s geometry and heat load | Check the runner balance and variation between cavities | Different walls and part sizes can shift filling and cycle time |
| Changes and spares | Rework affects the one tool for that part | Verify matching geometry after modifying affected cavity inserts | Review replaceable inserts or runner isolation for independently changing parts |
Answer four questions to see which tooling route to review and what data to bring to the drawing review.
Choose “Still to confirm” for any information you need to check.
Compare lifetime demand, spares and revision risk by part number. For a part likely to change, review a replaceable cavity insert or a separate tool.
Evaluate the feed path, pressure loss, gate positions and cooling. Agree how to verify balance at trial using short shots, part weights or measured dimensions by cavity.
Agree a cavity marking and sampling plan. First-article measurements establish a baseline. A cavity-level Cpk study requires suitable measurement, stable production and sufficient data.
Compare tooling amortization, press time, runner waste, maintenance and inspection for each cavity layout. Use production forecasts to decide whether the higher tooling investment pays back.
Agree ownership of the tool and drawings in the contract. Define asset identification, shot records, maintenance and the handover information needed if the mold moves.
Use these examples to review gates, tooling steel and inspection features for different parts.
Consider a shared layout when the two shells use the same resin and color. Place gates away from visible faces and check the parting seam and fit as a matched set.
For a glass-filled resin, compare wear-resistant inserts and symmetric feeding. Identify each cavity and record pitch and fit dimensions separately.
Review corrosion-resistant polishable steel, gate placement and venting. Declare visible and optical surfaces before validating haze, gate marks and appearance.
Use these figures for an initial review. The approved drawing, process route and quote set the requirements for the part.
Specify functional fits on the drawing and agree the applicable ISO 20457 provisions for molded dimensions. Verify selected critical dimensions separately for each active cavity.
| Item | Capability and conditions |
|---|---|
| Corrosion-resistant or high-polish tooling | S136 / Stavax ESR · HRC 48–52 · 1.2083 / 1.2316 |
| Wear-resistant tooling | 8407 / Orvar Supreme · HRC 48–52 · NAK80 HRC 37–41 · ASP-23 / HAP40 |
| Prototype or short-run tooling | P20 / 718H HRC 30–36. 7075-T6 aluminum tooling for selected unfilled resin prototypes. |
| Cavities and runner balance | 1 / 2 / 4 / 8 / 16 / 32 / 64 cavities; family tools with adjustable flow and valve-gated hot runners as required. |
| SPI 101 / 102 / 103 | ≥1,000,000 · 500,000–1,000,000 · 100,000–500,000 |
| SPI 104 / 105 | 10,000–100,000 · Al 5,000–10,000 |
| Customer tool ownership and transfer | Customer ownership after payment as contracted, with drawings, asset identification, cycle counter, preventive maintenance and transfer support. |
The listed cycle figures are planning ranges. Define the required life, resin and maintenance conditions when ordering the mold.
| Item | Capability and conditions |
|---|---|
| File check, standard and complex quotes | 2–4 h · 24 h · 48–72 h |
| Prototype mold, standard tool and complex T0/T1 | 10–15 business days · 3–4 weeks · 4–6 weeks |
| Simple and weld-add tool changes | 2–4 business days · 5–7 business days |
Quote timing starts with complete CAD, toleranced drawings, annual volume and resin or finish requirements. Confirm mold lead time and lot size per project.
Add a candidate resin family to the brief. Final material selection uses the supplier grade, color and the agreed measurement condition.
ABS / PC+ABS
For shells and clips, verify the grade’s shrinkage and keep color, texture and gate marks consistent across matching parts.
PC / PMMA
Review drying, shear, residence time and venting. Confirm haze and visual acceptance at the specified thickness.
PA66+GF / POM
Compare gate orientation, directional shrinkage and tool wear. For nylon, define whether measurement follows agreed conditioning.
TPE / TPU
For flexible parts, check venting, flash and the hardness-dependent measurement method. Overmolded parts also need a substrate-adhesion review.
Agree marking locations and keep trial samples sorted by cavity so appearance and dimensional differences remain visible.
Set the fixture and datums for the specified features. Select CMM, optical or gauge inspection according to accessibility and the drawing.
Protect polished faces and mating features. Link the shipping labels to the resin lot, production lot and agreed release documents.
Check wall transitions, draft, gate options and the cavity plan.
Confirm the steel grade, runner design, expected tool life and ownership terms.
Collect labeled samples from each active cavity and document the initial settings.
Review critical dimensions and appearance by cavity before approving the baseline.
Track settings, material lots and agreed checks when production changes.
Archive the agreed revision, packing method and tool maintenance record.
Review your selected routes, assessment, material and documents before attaching the brief to the inquiry.
A conventional shared sprue feeds the same resin and color. For different specifications, review separate shots, separate tools or a suitable multi-component process.
More cavities can raise output per cycle. Compare the resulting cycle time, press size, tool and maintenance cost, scrap and inspection workload at the forecast volume.
Review replaceable cavity inserts or independent runner shut-offs early. After a change or a cavity closure, check the remaining layout and revalidate the affected process.
Agree a plan for all active cavities. Label samples and record the critical features by cavity to catch differences in filling, shrinkage or dimensions.