Family and multi-cavity injection molding

Plan cavity layout, fill balance and per-cavity inspection before cutting steel.

Send CAD, toleranced drawings, annual demand for each part number and the resin grade. We review how the parts share a tool and what to verify on the first trial.

Multi-cavity mold beside molded parts still on the runner
1–64Cavity layouts for project review
SPI 101–105Tool life classes for planning
3–4 weeksStandard tool, first trial

Choose a cavity layout and runner strategy

A repeat-cavity tool makes the same part in every cavity. A family tool combines different parts. A hot runner can be evaluated with either layout.

Repeat-cavity mold

For a stable part design and repeat orders, evaluate extra cavities against press capacity, runner symmetry and inspection effort.

Family mold

Combine mating shells, buttons or clips where the resin, color and demand ratio fit a common shot. Review how changes or spare-part demand affect each part number.

Hot runner and sequential valve gates

Where the part calls for it, review temperature zones, gate sequencing and gate appearance. Compare runner waste and maintenance with a cold-runner design.

Single-cavity, repeat-cavity and family molds

Decision factorSingle-cavity moldRepeat-cavity moldFamily mold
Demand stageEarly validation or frequent design changesA stable single part number in repeat productionDifferent parts consumed together in known ratios
Resin and colorIndependent runs can change resin or color per partSame grade and color throughout one shotAll parts on a shared runner use the same resin and color
Filling and coolingTune to one part’s geometry and heat loadCheck the runner balance and variation between cavitiesDifferent walls and part sizes can shift filling and cycle time
Changes and sparesRework affects the one tool for that partVerify matching geometry after modifying affected cavity insertsReview replaceable inserts or runner isolation for independently changing parts

Check whether your parts are a fit for a family mold

Answer four questions to see which tooling route to review and what data to bring to the drawing review.

Complete the four answers

Choose “Still to confirm” for any information you need to check.

Engineering decisions before tool design

Compare lifetime demand, spares and revision risk by part number. For a part likely to change, review a replaceable cavity insert or a separate tool.

Three tooling examples, from enclosures to optics

Use these examples to review gates, tooling steel and inspection features for different parts.

Mating shells for a handheld enclosure

Consider a shared layout when the two shells use the same resin and color. Place gates away from visible faces and check the parting seam and fit as a matched set.

Eight-cavity connector housing layout

For a glass-filled resin, compare wear-resistant inserts and symmetric feeding. Identify each cavity and record pitch and fit dimensions separately.

Four-cavity clear optical cover layout

Review corrosion-resistant polishable steel, gate placement and venting. Declare visible and optical surfaces before validating haze, gate marks and appearance.

Tool steel, cavity options, SPI tool life and T1 timing

Use these figures for an initial review. The approved drawing, process route and quote set the requirements for the part.

Specify functional fits on the drawing and agree the applicable ISO 20457 provisions for molded dimensions. Verify selected critical dimensions separately for each active cavity.

Tool steel, cavity layout and service life
ItemCapability and conditions
Corrosion-resistant or high-polish toolingS136 / Stavax ESR · HRC 48–52 · 1.2083 / 1.2316
Wear-resistant tooling8407 / Orvar Supreme · HRC 48–52 · NAK80 HRC 37–41 · ASP-23 / HAP40
Prototype or short-run toolingP20 / 718H HRC 30–36. 7075-T6 aluminum tooling for selected unfilled resin prototypes.
Cavities and runner balance1 / 2 / 4 / 8 / 16 / 32 / 64 cavities; family tools with adjustable flow and valve-gated hot runners as required.
SPI 101 / 102 / 103≥1,000,000 · 500,000–1,000,000 · 100,000–500,000
SPI 104 / 10510,000–100,000 · Al 5,000–10,000
Customer tool ownership and transferCustomer ownership after payment as contracted, with drawings, asset identification, cycle counter, preventive maintenance and transfer support.

The listed cycle figures are planning ranges. Define the required life, resin and maintenance conditions when ordering the mold.

Molding quote and production schedule
ItemCapability and conditions
File check, standard and complex quotes2–4 h · 24 h · 48–72 h
Prototype mold, standard tool and complex T0/T110–15 business days · 3–4 weeks · 4–6 weeks
Simple and weld-add tool changes2–4 business days · 5–7 business days

Quote timing starts with complete CAD, toleranced drawings, annual volume and resin or finish requirements. Confirm mold lead time and lot size per project.

Assess shrinkage, flow and conditioning by resin grade

Add a candidate resin family to the brief. Final material selection uses the supplier grade, color and the agreed measurement condition.

ABS / PC+ABS

Rigid amorphous thermoplastics

For shells and clips, verify the grade’s shrinkage and keep color, texture and gate marks consistent across matching parts.

PC / PMMA

Clear optical polymers

Review drying, shear, residence time and venting. Confirm haze and visual acceptance at the specified thickness.

PA66+GF / POM

Semi-crystalline and reinforced resins

Compare gate orientation, directional shrinkage and tool wear. For nylon, define whether measurement follows agreed conditioning.

TPE / TPU

Thermoplastic elastomers and soft interfaces

For flexible parts, check venting, flash and the hardness-dependent measurement method. Overmolded parts also need a substrate-adhesion review.

Trace samples and inspection results by cavity

Cavity IDs and sample separation

Agree marking locations and keep trial samples sorted by cavity so appearance and dimensional differences remain visible.

First-article dimensions by cavity

Set the fixture and datums for the specified features. Select CMM, optical or gauge inspection according to accessibility and the drawing.

Protective trays and batch labels

Protect polished faces and mating features. Link the shipping labels to the resin lot, production lot and agreed release documents.

From drawing review to repeat production

  1. Drawings and flow review

    Check wall transitions, draft, gate options and the cavity plan.

  2. Agree steel and tooling scope

    Confirm the steel grade, runner design, expected tool life and ownership terms.

  3. Build the tool and run T1

    Collect labeled samples from each active cavity and document the initial settings.

  4. Inspect and approve samples

    Review critical dimensions and appearance by cavity before approving the baseline.

  5. Monitor production batches

    Track settings, material lots and agreed checks when production changes.

  6. Pack and retain the reorder record

    Archive the agreed revision, packing method and tool maintenance record.

Quality documents to include in the request

Send drawings for a family or multi-cavity mold review

Review your selected routes, assessment, material and documents before attaching the brief to the inquiry.

Your project brief

Submit drawings and project inquiry

Drawings & reference files

STEP/STP, PDF, JPG or PNG. Up to 3 files; 10 MB each, 20 MB total.

No files selected

    No drawing yet? Describe the part and application below.

    Questions before committing to a multi-cavity tool

    Can parts share a shot with different resin grades or colors?

    A conventional shared sprue feeds the same resin and color. For different specifications, review separate shots, separate tools or a suitable multi-component process.

    How does cavity count affect unit cost?

    More cavities can raise output per cycle. Compare the resulting cycle time, press size, tool and maintenance cost, scrap and inspection workload at the forecast volume.

    What if one part in a family mold changes?

    Review replaceable cavity inserts or independent runner shut-offs early. After a change or a cavity closure, check the remaining layout and revalidate the affected process.

    Which cavities should first-article inspection cover?

    Agree a plan for all active cavities. Label samples and record the critical features by cavity to catch differences in filling, shrinkage or dimensions.