Skip to content

Custom parts manufacturing services

From prototype validation to repeat orders, compare CNC machining, injection and LSR molding, 3D printing and sheet metal fabrication. Send your drawings to review materials, interfaces, inspection and the delivery scope.

4Processes
35Specialist service pages
2–6 hStandard 3D printing quote response

Four manufacturing processes and specialist services

Open a service for technical details or add one or more processes to your enquiry. You can also submit drawings for a route recommendation.

Choose a route by project stage

Choose what the next batch needs to prove. The examples show typical uses and confirmed process-specific planning ranges.

Compare engineering requirements across processes

Use the figures for the named feature or production stage. Confirm the drawing standard, edition and inspection method before ordering.

Decision factorCNC machiningInjection / LSR moldingIndustrial 3D printingSheet metal fabrication
Example tolerance or evaluationConfirm feature, datum, fixturing and measured state for close-fit dimensions.Noncritical molded dimensions up to 30 mm±0.05–0.10 mmSLA linear tolerance in the as-printed state±0.10 mm (≤100 mm) / ±0.15%Formed linear dimensions / precision hole spacing±0.15–0.30 mm · ±0.10–0.15 mm
Planning referenceCNC prototype and validation lots1–50 pcsRapid prototype mold to first trial10–15 business daysPolymer 3D printing prototyping2–4 business daysCut-and-bent sheet metal prototypes3–5 business days
Tooling and setupConfirm setup count and any dedicated fixtures or gauges.Choose mold material, cavity count and first-trial acceptance.Check orientation, support removal and secondary operations.Review punch tooling, bend tools and joint access for each route.
Quote response by process
ItemCapability and conditions
Injection, standard / complex24 h · 48–72 h
3D printing, standard / metal or complex finishing2–6 h · 12–24 h
Sheet, standard / complex assemblies4–12 h · 24–36 h

Timing starts with complete drawings. The initial review checks drawing revision, materials, quantities and required inspections.

Materials, finishing and inspection across processes

Material grade and supply form

For example, review 6061-T6 or Ti-6Al-4V for CNC, PC/ABS or LSR for molding, PA12 for the relevant powder-based printing process, and 5052 sheet or stainless steel for fabrication. Confirm 304, 316 and 316L separately and specify traceability or material certificates where needed.

From drawing review to shipment

  1. Drawing and DFM review

    Confirm revisions, datums and the functional purpose of critical features.

  2. Process and grade selection

    Agree material, process sequence and the scope of the quote.

  3. First article verification

    Check the agreed features on the approved drawing and sample.

  4. Production and finishing

    Identify batches and apply the agreed finishing and masking requirements.

  5. Final inspection and release

    Verify dimensions, assembly fit or appearance as scoped in the order.

  6. Packing and repeat orders

    Agree protection for sensitive surfaces and retain the batch and revision reference.

Order controls and document handling
ItemCapability and conditions
Delivery terms by written agreementEXW, FCA, FOB, DAP or DDP may be agreed for suitable shipments. Confirm schedule, quantity tolerance, packaging and acceptance window in the order.
Written approval for substitutionsReview grade, source, condition and recycled content against the drawing. Submit data sheets, compliance evidence and engineering impact for written approval before a substitution.
Engineering and process changesReview customer drawing revisions in 24–48 hours, including stock, cost and first article impact. Agree notice window, verification and written release before major process changes.
NDA, access and recordsMutual NDA and restricted drawing access are available. Retention and destruction follow agreed project terms and regulatory requirements.

Multi-process preassembly and component insertion

For assemblies combining machined, molded, printed or sheet-metal parts, agree which components arrive installed and which ship separately. Confirm project-specific insertion or positioning fixtures before release.

BOM and supplied parts

Provide the BOM, exploded view, part revisions and quantity per assembly. Identify customer-supplied connectors, clips, fasteners and approved substitutes.

Insertion sequence and positioning

Define orientation, locating datums and installation order. For press fits, mating connectors or snap clips, specify force, locking, clearance or height as relevant.

Trial fit and delivery

Approve a first assembly and agree visual, dimensional or functional checks. Define lot traceability, protection for contacts and finish, and packing by kit.

How different processes fit together

The examples show how to plan interfaces and acceptance on a multi-process assembly. Scope each operation and report on the project drawings.

Industrial sensor enclosure

An assembly could combine an anodized 6061-T6 machined housing, a formed 304 stainless bracket, a molded PC/ABS bezel and an LSR seal. Use the BOM and drawings to define interface dimensions, finish buildup, seal compression and trial fitting.

Lightweight robot joint bracket

A Ti-6Al-4V LPBF bracket can be evaluated with CNC finishing for the bearing seats. Specify machining stock, the datum scheme after printing and the measured bore requirements at final inspection.

FAQs

Can I request a quote while the process is undecided?

Send the drawing, intended use and estimated quantity. We can review feasible routes for the prototype and compare what would change for repeat orders.

Can one enquiry cover an assembly made by several processes?

Yes. Share the BOM and identify each part, revision and interface. Agree trial fitting, assembly responsibility and package contents in the quote.

How are drawing confidentiality and changes handled?

You can request a mutual NDA before sending confidential files. Identify the revision and affected parts for changes so stock, cost and first article impact can be reviewed.

Which delivery terms and documents can be agreed?

Confirm the named place or port, transport mode and Incoterms® edition in the order. FOB applies to sea or inland waterway shipments. Agree inspection, packing and customs documents for the shipment.

ICC · Incoterms® 2020

Send drawings for a joint engineering review

Share the drawing revision, quantity, material and critical mating features. For a multi-part assembly, include the BOM in PDF and identify which drawings belong to each component.

Project brief

Processes to review

Choose applicable processes or a stage, or describe your needs in the enquiry.

Contact and CAD files

Drawings & reference files

STEP/STP, PDF, JPG or PNG. Up to 3 files; 10 MB each, 20 MB total.

No files selected

    No drawing yet? Describe the part and application below.

    Open the multi-part enquiry form

    KEEPWIN · LANGUAGE

    Choose your language

    Select the language you prefer for your visit.

    You can change your language anytime in the menu.