Contact CMM
Verify machined datums, hole positions and coaxial features. Specify the datum scheme and access for the probe.
Inspect parts in the condition in which they will ship. Define the final material state, critical dimensions and evidence needed for acceptance.
For SLA, SLS, MJF, FDM and metal LPBF, match CMM, scanning, gauges or material testing to the drawing and inspection plan.
Agree the datums, fixture state, equipment suitability and sampling before inspection.
Verify machined datums, hole positions and coaxial features. Specify the datum scheme and access for the probe.
Map profile deviation on visible freeform surfaces and thin housings. Specify CAD alignment, supports and surfaces to capture.
Specify coupon section and sampling location for metallography. For Ra or Rz, agree the measurement direction and final surface condition.
Verify accessible thickness, bores and threads. Choose contact force and support for flexible parts, and state whether checks are sampled or performed on every part.
Use these reference values to review the drawing. The agreed inspection plan defines critical features and the final acceptance limits.
| Feature or condition | Reference for review | Typical verification |
|---|---|---|
| Typical as-printed linear tolerance | ±0.10 mm (≤100 mm) / ±0.15% | Calipers, CMM or scan as appropriate |
| Wall, through-hole and access-channel minima | 0.8–1.0 mm · Ø0.8–1.0 mm · 0.6–0.8 mm | Gauge, fit test or channel-access check |
| Selected features after secondary work | ±0.03–0.05 mm | Measure from agreed drawing datums |
| Final state for inspection | Wash, post-cure and finish as specified | Record applicable processing and measure after it is complete |
| Feature or condition | Reference for review | Typical verification |
|---|---|---|
| Typical as-printed linear tolerance | ±0.25 mm (≤100 mm) / ±0.30% | Calipers, CMM or scan as appropriate |
| Wall, through-hole and access-channel minima | 0.8–1.2 mm · Ø1.5 mm · 1.2–1.5 mm | Gauge, fit test or channel-access check |
| Selected features after secondary work | ±0.05 mm | Measure from agreed drawing datums |
| Final state for inspection | Cool, depowder and condition the specified nylon where required | Record applicable processing and measure after it is complete |
| Feature or condition | Reference for review | Typical verification |
|---|---|---|
| Typical as-printed linear tolerance | ±0.20 mm (≤100 mm) / ±0.25% | Calipers, CMM or scan as appropriate |
| Wall, through-hole and access-channel minima | 0.8–1.0 mm · Ø1.2–1.5 mm · 1.0–1.2 mm | Gauge, fit test or channel-access check |
| Selected features after secondary work | ±0.05 mm | Measure from agreed drawing datums |
| Final state for inspection | Cool, clear powder from channels, then confirm final color and finish | Record applicable processing and measure after it is complete |
| Feature or condition | Reference for review | Typical verification |
|---|---|---|
| Typical as-printed linear tolerance | ±0.20 mm (≤100 mm) / ±0.20% | Calipers, CMM or scan as appropriate |
| Wall, through-hole and access-channel minima | 1.0–1.2 mm · Ø1.5–2.0 mm · 1.2–1.5 mm | Gauge, fit test or channel-access check |
| Selected features after secondary work | ±0.05 mm | Measure from agreed drawing datums |
| Final state for inspection | Confirm layup, support removal and any inserts or finishing | Record applicable processing and measure after it is complete |
| Feature or condition | Reference for review | Typical verification |
|---|---|---|
| Typical as-printed linear tolerance | ±0.10 mm (≤100 mm) / ±0.15% | Calipers, CMM or scan as appropriate |
| Wall, through-hole and access-channel minima | 0.5–0.8 mm · Ø1.0–1.5 mm · 0.8–1.0 mm | Gauge, fit test or channel-access check |
| Selected features after secondary work | ±0.005–0.01 mm | Measure from agreed drawing datums |
| Final state for inspection | Complete alloy-specific stress relief and any machining or finish | Record applicable processing and measure after it is complete |
| Relative-density target by alloy and build | 99.5–99.8% | Archimedes or metallography; X-ray or CT when agreed |
| Item | Capability and conditions |
|---|---|
| Build direction review | Keep critical cosmetic faces away from supports where possible. Review hole orientation and XY/Z properties for loaded clips. |
| Powder and resin cleaning | MJF/SLS cooling, bead blasting, air and cleaning; SLA washing and controlled UV post-cure; PolyJet support removal per material. |
| PA11/PA12 conditioning when specified | 50 °C · 70% RH · 1.5–2.5% |
| Heat, ageing and witness coupons | HDT 0.45 / 1.82 MPa · 85 °C / 85% RH · QUV · ASTM D638 / D790 |
| Item | Capability and conditions |
|---|---|
| Relative density and associated tests | 99.5–99.8% target by alloy and build. Archimedes or metallography, tensile and hardness on build coupons, X-ray or CT where agreed. |
Agree heat-treatment program, supporting coupons and documented acceptance on the drawing.
These examples show what to specify before release, from sealing faces to hard-to-clean cavities.
LPBF · AlSi10Mg / 316L
Agree stress relief for the chosen alloy and stock on the sealing and locating faces. Measure flatness and mounting features after machining. Agree a separate leak test when the assembly must seal.
SLA
Review support during cure and protect marked bores before coating. Inspect the span after cure and finish in the agreed free or supported state.
SLS / MJF · PA12
Identify blind bores and internal channels, make powder removal accessible and agree how to verify cleanliness. If conditioning is specified, measure after the target material state is reached.
Select a starting scope for the inquiry. Confirm report contents, sampling and lead time for your drawing.
If aerospace first-article documentation is requested, specify the applicable revision and required deliverables. SAE AS9102C ↗
Link the material, process and acceptance records to the drawing revision. Reassess affected checks when the build or finish changes.
Confirm the revision, critical interfaces, final finish and quantities by release.
Link feedstock lots to the build plan and record powder refresh where applicable.
Record the agreed orientation and build identification. Add witness specimens when the plan calls for material verification.
Schedule cleaning, curing, heat treatment or machining according to the approved route.
Check agreed features and record deviations and their disposition before release.
Archive the release record against the approved drawing and keep the lot identity with the shipment.
| Item | Capability and conditions |
|---|---|
| Build traceability | Material lot, powder refresh where relevant, build map, heat treatment or cure and inspection records. |
| Nonconformity and reprint | Confirmed manufacturing nonconformities receive a response within 24 hours and priority reprint, with expedited dispatch subject to process. |
Attach a STEP or STP model and a toleranced PDF. Mark critical characteristics, surface condition and the records or tests you need.
Choose a process or a documentation level to prepare your brief.
No. Orientation, geometry, material behavior, calibration and finishing also affect the result. Critical dimensions need an agreed tolerance and inspection method.
No. It supplies evidence for its own specimen and conditions. The component’s geometry, interfaces and load cases may require separate checks.
Agree whether to measure free, supported or installed. Use optical scanning for accessible surfaces where suitable, or specify the fixture and contact force for touch measurements.
Define machining stock, fit and datum on the drawing. After CNC finishing, verify the bore with the agreed dimensional method and the thread with the specified gauge.
Identify the drawing revision, measured features, datums, sample and batch identity, material condition and any functional test method and acceptance limits.