Vertical rotary insert molding
A rotary arrangement can separate loading from the injection station. Review insert seating, gravity-assisted placement and presence sensing when the insert shape or orientation requires it.
Design the insert and surrounding plastic as one load-bearing joint.
Submit separate CAD files for the plastic part and insert. Before tooling, we review boss thickness, anti-rotation and pull-out features, thread shut-off and how the joint will be tested.
Review how the insert is fed and held in the mold. For threaded inserts, also compare molded-in installation with post-mold methods where the part and resin permit.
A rotary arrangement can separate loading from the injection station. Review insert seating, gravity-assisted placement and presence sensing when the insert shape or orientation requires it.
For repeated placement of standard inserts, evaluate feed orientation, gripper access and how the nest confirms the insert has seated before injection.
For terminals on a stamped carrier strip, review feed pitch, pilot features and carrier trimming. Define the surfaces to keep exposed and the coplanarity to verify after molding.
| Installation method | Retention mechanism | Boss and process review | When to evaluate |
|---|---|---|---|
| Molded-in insert | Resin fills the insert’s knurls and grooves during molding. | Review hoop stress, plastic cover and surfaces that must stay free of resin. | Repeated assembly, load-bearing inserts or integration of irregular parts. |
| Post-mold heat insertion | A heated insert softens the hole wall and displaces plastic into its retention features. | Confirm the hole profile, insertion depth and thermal window for the thermoplastic grade. | A compatible threaded insert in a pre-molded boss with tool access. |
| Ultrasonic insertion | Ultrasonic vibration locally softens the polymer as the insert is seated. | Review horn access, part support and any signs of stress or cracking after installation. | Repetitive installation after the chosen resin and geometry pass sample validation. |
Each example identifies the insert, the surrounding resin and the features to verify on the assembly.
Cu + PBT-GF
Evaluate glass-filled PBT around the formed copper busbar. Define the shut-off around exposed pads and agree the dimensional and dielectric checks for the assembly.
PA66-GF + CuZn
Locate the central bearing and the peripheral threaded inserts in one assembly. Check alignment, bearing rotation after molding and torque at the threaded positions.
SUS303 + LCP
Review LCP as a candidate around a magnet ring and turned shaft. Evaluate anti-rotation geometry, fill pressure and post-mold checks for runout and cracking.
Check the boss and shut-off geometry, then review confirmed insert materials, test targets and resin wall design.
| Design feature | What to review |
|---|---|
| Boss wall around the insert | Review the boss outer diameter and the remaining radial wall together. Check hoop stress as the resin cools around the insert, especially where a thin wall meets a sharp corner. |
| Plastic beneath a blind insert | Leave even support under the insert. Review local wall thickness, flow and the outside surface for sink or distortion. |
| Insert end face, knurl and groove | Define where the end face seals against the tool. Review knurl and groove transitions for stress concentrations and confirm the thread remains accessible. |
| Insert preheating and surface condition | Evaluate preheating for the chosen metal and resin, especially on larger inserts. Use trial parts to check the cooling response and the interface. |
| Locating pin and thread shut-off | Confirm the locating fit separately from the surface that stops resin from entering the thread. Check location, seating and resin intrusion on T1 samples. |
Use these figures for an initial review. The approved drawing, process route and quote set the requirements for the part.
| Item | Capability and conditions |
|---|---|
| Threaded or custom inserts | C36000 brass, SUS303 / 304 / 316L; straight or diamond knurl, undercut, blind or through thread; busbars, studs, terminals, magnets and MIM inserts. |
| Placement and retention | Automatic or semi-automatic loading, pilot pin H7/g6, shoulder stop, vacuum or magnetic retention as compatible. |
| Pull-out in PC / PA66, M3–M6 | 800–2,500 N · 5–10 mm/min |
| Torque-out targets by insert size | M3: 1.5–2.5 N·m · M4: 3.0–5.0 N·m |
Set pull-out and torque requirements by insert length, plastic wall thickness and customer test method.
| Item | Capability and conditions |
|---|---|
| File check, standard and complex quotes | 2–4 h · 24 h · 48–72 h |
| T1 dispatch and pilot run after approval | 2–3 business days · 500–3,000 pcs / 5–10 business days |
Quote timing starts with complete CAD, toleranced drawings, annual volume and resin or finish requirements. Confirm mold lead time and lot size per project.
| Candidate resin family | Wall and process checks |
|---|---|
| PA6 / PA66 / PA+GF | Review filling around the insert, weld-line position and the effect of fiber reinforcement on shrinkage. |
| PC / PC+ABS | Check the local boss wall and stress at sharp transitions, then validate under the expected fastener load. |
| PBT / PPS / LCP | For busbars and connectors, confirm minimum remaining insulation after molding and validate with the electrical test specified for the assembly. |
| ABS / PP | Review shrinkage and local wall transitions around the insert. Check the finished part against assembly datums and expected load. |
Set the wall thickness for the specified grade and geometry. Use the drawing to distinguish molded dimensions from insert position and fit, and agree the applicable ISO 20457 provisions for molded dimensions.
Agree how the specimen is supported and loaded. Record axial pull-out force in N and the torque that causes the insert to rotate in N·m, with the failure mode.
Agree datums for terminal pitch, insert position and the exposed contact boundary. Choose optical or contact measurement based on access and required accuracy.
Define GO/NO-GO gauging scope and inspect for resin in the threads. Specify separate pockets and ESD protection for parts that need them.
Review the boss, load path and surfaces to keep free of resin.
Assign insert supply, incoming acceptance and how parts will be presented to the mold.
Check critical insert dimensions and surface condition. Confirm seating and movement in the tool during the trial.
Run the agreed mechanical, dimensional and thread checks and record the results for approval.
Use the agreed presence or orientation checks and record the approved process settings.
Link the resin and insert lots to the shipment and include the inspection documents agreed for the order.
Select the insert, supply responsibility, loading route and verification scope. Review the brief before attaching it to your inquiry.
Review the specific drawing first. Molded-in inserts need geometry the tool can locate and support, plus shut-off surfaces that protect the thread. Heat and ultrasonic inserts are designed around the hole and the way they are installed.
Define the sealing features and test the complete assembly. Agree the ingress rating or leak-rate target, pressure, conditioning and whether temperature cycling precedes testing.
Review the surrounding wall, rounded transitions, insert temperature and resin shrinkage as a system. Validate the design on trial parts under the intended loads and temperature changes.
Send the insert drawing and quantities for machining or sourcing review. For customer-supplied inserts, agree incoming dimensions, surface cleanliness, packaging and trial quantity before delivery.