Skip to content

Injection molding quality and inspection

Measure each feature in the condition that matters for the part.

Agree drawing datums, material conditioning, appearance zones and functional tests before approving the first articles. Document the sample, method and release criteria so later batches can be evaluated on the same basis.

Coordinate measuring probe over a molded connector in a fixture
VMM / CMMDimensional inspection by geometry
D65Reference light for color comparison
23 ± 2 °C · 50 ± 5% RH · 24 hReference conditioning when specified
ISO 2859-1Sampling plan to agree by project

Choose a method for geometry, flexibility and function

Define the feature, how to hold the part and which result will decide acceptance.

VMM non-contact optical inspection

Use backlit edges where they can be detected reliably. For thin walls or soft seals, agree free-state support and the measurable features. Use CMM for suitable three-dimensional datums.

What to agree before testing
Datum, edge definition and fixture

Three examples of how to isolate an inspection risk

Use the examples to decide how to label parts, reproduce the issue and verify a correction.

Multi-cavity connector isolation

If a pin hole trends small, separate the samples by cavity. Verify the hole with a suitable gauge and recheck the affected and neighboring cavities after any tooling correction.

PA66 gear checked after conditioning

Mark dry and conditioned samples separately. Compare the dimensions that affect assembly in the agreed state and record how the sample was stored before measurement.

Transparent PC cover viewed with backlighting

Use agreed lighting and a limit sample to distinguish specks, streaks and marks. Set separate criteria for haze, transmittance or stress inspection if the application needs them.

Define acceptance criteria for the drawing and purchase order

Review sampling, inspection packages and appearance zones before approving the initial samples.

Defect classPossible examplesResponse to agree
CriticalA safety hazard or prohibited material for the application.Agree immediate containment and any required screening or rejection.
MajorAn out-of-spec fit, broken latch or loose insert.Segregate affected parts and use the agreed sampling thresholds and lot disposition.
MinorA superficial mark away from fit surfaces.Compare against the appearance zones and the approved limit sample.

With ISO 2859-1, agree the edition, lot definition, inspection level and AQL by defect class. Apply the selected plan’s sample size, acceptance and rejection numbers and switching rules.

Match the inspection condition to the resin

Select a resin family for the brief, then specify the actual grade and measurement condition on the drawing.

PA6 / PA66

Hygroscopic nylons

Agree dry-as-molded or conditioned measurement and which fit dimensions to recheck after storage. Set temperature, humidity and duration for the actual part.

PC / PMMA

Clear PC and PMMA

Use backlight for visible defects and define the specimen thickness and method for haze and transmittance, such as ASTM D1003 where applicable.

PA66+GF / PBT+GF

Glass-filled engineering resins

Distinguish free-state warpage from measurements in a simulated assembly fixture. Use the drawing to define restraint, datums and fiber-content checks if required.

TPE / TPU / LSR

Thermoplastic elastomers and soft interfaces

Agree support and contact force, or use suitable non-contact measurement. Set hardness and compression tests per grade, and verify any LSR contact-use documents separately.

Six steps from the inspection plan to lot release

Signed reference samples and protective release

Agree how to retain and label the reference sample with the drawing revision, resin lot and color reference. Link the shipping records to the lot and choose protective trays, ESD or moisture protection as needed.

  1. Agree the drawing and inspection plan

    Identify critical dimensions, appearance zones, sample states and fixtures.

  2. Check the incoming resin lot

    Verify grade, lot and requested documents. Record the approved color and any regrind limits.

  3. Verify initial samples by cavity

    Label active cavities and record the agreed results against the drawing.

  4. Review pilot evidence and ramp-up

    Agree MSA, Cpk or PPAP evidence and the release conditions where requested.

  5. Monitor production

    Record agreed checks and isolate suspected parts when results go beyond the limit.

  6. Release and ship the lot

    Apply the agreed acceptance plan and include the requested lot records.

Send drawings and an inspection brief for review

Choose methods, resin context and documents. Add the sampling requirements from your project and verify the brief before attaching it.

Inspection plan brief

Inspection methods
Quality documents for this inquiry

Enter the agreed plan or leave this open for review.

Submit drawings and project inquiry

Drawings & reference files

STEP/STP, PDF, JPG or PNG. Up to 3 files; 10 MB each, 20 MB total.

No files selected

    No drawing yet? Describe the part and application below.

    Quality questions from engineering and purchasing

    What happens after a lot issue is reported?

    Share the lot, cavity ID where available, defect photos and inspection data. Agree containment, scope of affected stock and the corrective action report and timing.

    When should I use VMM or CMM?

    Choose according to features and datums. VMM suits suitable visible edges and avoids probe force. CMM can evaluate accessible three-dimensional features with suitable fixturing.

    How are parting and ejector marks judged?

    Mark the visible and hidden surfaces on the drawing. Agree allowable process marks and the viewing conditions against an approved limit sample.

    How do we request third-party testing?

    Specify the intended use, material or finished assembly, applicable standard and laboratory requirements. We can review the request and the evidence already available for that grade.

    Why can a nylon part fit differently after delivery?

    Compare the dry, conditioned and received states. Check how the parts were stored and measured, and agree the relevant state before evaluating the fit.

    KEEPWIN · LANGUAGE

    Choose your language

    Select the language you prefer for your visit.

    You can change your language anytime in the menu.