Measure each feature in the condition that matters for the part.
Agree drawing datums, material conditioning, appearance zones and functional tests before approving the first articles. Document the sample, method and release criteria so later batches can be evaluated on the same basis.
Coordinate measuring probe over a molded connector in a fixture
VMM / CMMDimensional inspection by geometry
D65Reference light for color comparison
23 ± 2 °C · 50 ± 5% RH · 24 hReference conditioning when specified
ISO 2859-1Sampling plan to agree by project
Choose a method for geometry, flexibility and function
Define the feature, how to hold the part and which result will decide acceptance.
VMM non-contact optical inspection
Use backlit edges where they can be detected reliably. For thin walls or soft seals, agree free-state support and the measurable features. Use CMM for suitable three-dimensional datums.
What to agree before testing
Datum, edge definition and fixture
D65 color and gloss evaluation
Compare the part with a signed color sample under the agreed lighting. For instrumental color or gloss, specify measurement position, color-difference formula and gloss angle where applicable.
What to agree before testing
Reference sample, ΔE method and lighting
Insert pull-out and snap-fit testing
Agree how the assembly is held and loaded. Select axial pull-out, torque-out, peel or repeated engagement according to the interface, then record load and failure mode.
What to agree before testing
Support, loading rate and acceptance value
Leak and seal integrity checks
Agree the assembled test condition, medium, pressure, stabilization time and leak limit. For an IP rating, define the required ingress test on the finished assembly.
What to agree before testing
Test volume, fixture and permitted leak rate
Three examples of how to isolate an inspection risk
Use the examples to decide how to label parts, reproduce the issue and verify a correction.
Multi-cavity connector isolation
If a pin hole trends small, separate the samples by cavity. Verify the hole with a suitable gauge and recheck the affected and neighboring cavities after any tooling correction.
PA66 gear checked after conditioning
Mark dry and conditioned samples separately. Compare the dimensions that affect assembly in the agreed state and record how the sample was stored before measurement.
Transparent PC cover viewed with backlighting
Use agreed lighting and a limit sample to distinguish specks, streaks and marks. Set separate criteria for haze, transmittance or stress inspection if the application needs them.
Define acceptance criteria for the drawing and purchase order
Review sampling, inspection packages and appearance zones before approving the initial samples.
Defect class
Possible examples
Response to agree
Critical
A safety hazard or prohibited material for the application.
Agree immediate containment and any required screening or rejection.
Major
An out-of-spec fit, broken latch or loose insert.
Segregate affected parts and use the agreed sampling thresholds and lot disposition.
Minor
A superficial mark away from fit surfaces.
Compare against the appearance zones and the approved limit sample.
With ISO 2859-1, agree the edition, lot definition, inspection level and AQL by defect class. Apply the selected plan’s sample size, acceptance and rejection numbers and switching rules.
Comparison criterion
First-article inspection (FAI)
PPAP submission, level to agree
Purpose
Verify the first samples against the agreed drawing revision.
Review evidence for production part approval under customer requirements.
Evidence and coverage
Agreed dimensions, drawing callouts, sample and cavity identifiers.
Confirm the submission level and evidence list. It may include PSW, control plan, process FMEA, MSA, dimensional results and samples.
When to agree
Set the sampling and features before T1 or the agreed requalification.
Agree timing, sign-off roles and any customer-specific requirements before the production trial.
Injection resins and traceability
Item
Capability and conditions
Customer-supplied or specified resin
Grade, origin and lot can be specified. Regrind or substitution requires written approval.
Grade-specific documents
COA, TDS and SDS. For relevant grades, request filler content, UL 94 Yellow Card by thickness, transmittance, haze or contact-compliance documentation.
Appearance zone
What to define
Zone A · Primary visible surface
Define viewing distance, lighting and signed limits for marks, color or gloss.
Zone B · Secondary visible surface
Agree limits for parting lines, gate vestiges and marks on the secondary surfaces.
Zone C · Internal or hidden surface
Identify acceptable process marks, provided the feature still meets assembly and functional requirements.
Molded part tolerances and inspection
Item
Capability and conditions
Noncritical features up to 30 mm
±0.05–0.10 mm
Critical fit in PC, ABS and PC/ABS
±0.015–0.030 mm
Critical dimensions in PA, POM or PP
±0.03–0.05 mm
Selected LSR features
±0.05–0.10 mm · ISO 3302-1 M1
Conditioning and measurement
23 ±2 °C · 50 ±5% RH · 24 h · VMM / CMM
Agreed cosmetic color reference
D65 · ΔE ≤ 0.8–1.0 · ΔE ≤ 0.5
Gate vestige, flash and mismatch by drawing
0.10–0.15 mm · 0.02–0.03 mm (TP) / 0.03–0.05 mm (LSR) · 0.02–0.03 mm
Ranges apply to selected parts and features. Agree size, resin, shrinkage and cosmetic master before FAI. DIN 16742 / ISO 20457 and ISO 3302-1 references follow the drawing and specified edition.
Liquid silicone rubber molding
Item
Capability and conditions
Food and medical documentation by grade
21 CFR 177.2600 · LFGB · USP Class VI · ISO 10993-5 / -10 / -11 · DMF
Cleanroom molding arrangements
ISO Class 7 / Class 8
Shore A 20–70 is the usual range. Agree color, cure schedule, cleanroom requirements and report coverage for the selected grade and part.
Match the inspection condition to the resin
Select a resin family for the brief, then specify the actual grade and measurement condition on the drawing.
PA6 / PA66
Hygroscopic nylons
Agree dry-as-molded or conditioned measurement and which fit dimensions to recheck after storage. Set temperature, humidity and duration for the actual part.
PC / PMMA
Clear PC and PMMA
Use backlight for visible defects and define the specimen thickness and method for haze and transmittance, such as ASTM D1003 where applicable.
PA66+GF / PBT+GF
Glass-filled engineering resins
Distinguish free-state warpage from measurements in a simulated assembly fixture. Use the drawing to define restraint, datums and fiber-content checks if required.
TPE / TPU / LSR
Thermoplastic elastomers and soft interfaces
Agree support and contact force, or use suitable non-contact measurement. Set hardness and compression tests per grade, and verify any LSR contact-use documents separately.
Six steps from the inspection plan to lot release
Signed reference samples and protective release
Agree how to retain and label the reference sample with the drawing revision, resin lot and color reference. Link the shipping records to the lot and choose protective trays, ESD or moisture protection as needed.
1
Agree the drawing and inspection plan
Identify critical dimensions, appearance zones, sample states and fixtures.
2
Check the incoming resin lot
Verify grade, lot and requested documents. Record the approved color and any regrind limits.
3
Verify initial samples by cavity
Label active cavities and record the agreed results against the drawing.
4
Review pilot evidence and ramp-up
Agree MSA, Cpk or PPAP evidence and the release conditions where requested.
5
Monitor production
Record agreed checks and isolate suspected parts when results go beyond the limit.
6
Release and ship the lot
Apply the agreed acceptance plan and include the requested lot records.
Send drawings and an inspection brief for review
Choose methods, resin context and documents. Add the sampling requirements from your project and verify the brief before attaching it.
Inspection plan brief
Enter the agreed plan or leave this open for review.
Share the lot, cavity ID where available, defect photos and inspection data. Agree containment, scope of affected stock and the corrective action report and timing.
When should I use VMM or CMM?
Choose according to features and datums. VMM suits suitable visible edges and avoids probe force. CMM can evaluate accessible three-dimensional features with suitable fixturing.
How are parting and ejector marks judged?
Mark the visible and hidden surfaces on the drawing. Agree allowable process marks and the viewing conditions against an approved limit sample.
How do we request third-party testing?
Specify the intended use, material or finished assembly, applicable standard and laboratory requirements. We can review the request and the evidence already available for that grade.
Why can a nylon part fit differently after delivery?
Compare the dry, conditioned and received states. Check how the parts were stored and measured, and agree the relevant state before evaluating the fit.