Coordinate multiple printing processes
Assign each part number to a suitable process. Align drawings, revision control and interfaces where parts from different processes must fit together.
Plan repeat orders around an approved drawing, material grade, build and inspection plan.
Send the quantity per shipment and the annual forecast separately. KeepWin reviews the build route, finishing, traceability and packaging with its production partners.
Add the printing, finishing or inspection services you want reviewed.
Assign each part number to a suitable process. Align drawings, revision control and interfaces where parts from different processes must fit together.
Review build orientation, stress relief and machining stock for critical bores or datums. Agree any witness specimens and heat-treatment records with the order.
Review PA12 for repeat housings and manifolds. Specify build positions, powder refresh and the post-finish fit or sealing test.
Choose by nylon grade, finishing and powder-removal access. Define handling for thin, flexible or moving features after depowdering.
Record the layup direction, wall structure, filament and insert method for fixtures or large assemblies. Confirm any joint or finished datum.
Choose CMM for accessible datums and optical scanning for suitable contours. Set the sampling plan and separate measurement reports by batch.
Approve the finish sample and mark no-coat surfaces. Agree how to check color, dimensions and the condition of threads or sealing faces.
Open a topic to see what to include in the drawing and validation plan.
Keep CAD and drawing revisions aligned with material grade, process, orientation and any critical build settings. For extrusion parts, internal construction can matter; for resin parts, curing matters; for powder-bed parts, thermal and finishing routes matter.
Identify the approved sample and what it demonstrates. Record accepted deviations and unresolved questions. A sample made with a different material or manual rework should not silently become the reference for a production route that cannot reproduce it.
Additive manufacturing can reduce the need for dedicated forming tools and support design variety or smaller runs. That does not make it the cheapest option for every quantity. Build packing, material use, supports, cleanup, finishing and inspection all contribute to cost.
Compare realistic order quantities and revision risk with machining or molding where appropriate. A high forecast is not the same as committed demand. Parts that can share a build may still need different finishing, identification or packing operations.
A new material lot, machine route, build orientation, software preparation or finishing process can affect the result. Identify the decisions that must remain fixed and the events that call for targeted checks or new samples. The level of control should fit the application.
Where traceability is required, link file revision, material and relevant build or batch identification. Keep finished part numbers distinguishable after support or powder removal. A build log and a dimensional report answer different questions and should not be treated as interchangeable evidence.
Agree on checks for important dimensions, appearance and function. Depending on the process and risk, sampling may need to represent different build positions, batches or finishing lots. One favorable part is not proof that all parts share its result.
Define how nonconforming parts are segregated, investigated and dispositioned. Specify any material, mechanical or specialized inspection records before ordering. Required evidence and acceptance limits should be part of the quotation, not an assumption added at delivery.
Cooling, washing, curing, depowdering, machining, coloring and assembly can determine the actual delivery schedule. Plan these together with printing. Finished parts may need protective packing to avoid cosmetic damage, distortion or mixing during transport.
KeepWin confirms the manufacturing scope and commercial terms with the selected partners. Provide quantities by delivery, forecast separately, final finishing requirements and reorder expectations. Preserve the approved route so later supply can be compared against the same requirements.
Use the example batch sizes to compare quotes for the same part and finish. List annual forecasts separately from the first order.
| Example batch size | Routes to evaluate | Cost factors | Schedule to confirm |
|---|---|---|---|
| Under 200 parts | Additive pilot or order of spare parts | Compare the cost of printing, finishing and inspection across drawing revisions. | First-article review and earliest finished delivery. |
| 200–999 parts | Repeat additive batches | Compare usable build density, cleaning, finish and inspection per accepted part. | Build availability, finishing capacity and batch release dates. |
| 1,000–2,000 parts | Compare additive with bridge tooling | Compare tooling investment, revision risk and total cost at committed volumes. | Compare first molded samples with the additive delivery schedule. |
| Over 2,000 parts | Evaluate injection molding for a stable design | Check mold feasibility, tool life and demand per variant. Keep additive quotes for variants or spare parts where useful. | Tooling, trial approval and capacity for recurring releases. |
The thresholds organize quote comparisons. The crossover depends on geometry, tooling, finishing, inspection and shipment schedule.
| Item | Capability and conditions |
|---|---|
| Standard and complex quotes | 2–6 h · 12–24 h |
| Polymer prototypes, cosmetic finishing and expedited dispatch | 2–4 business days · 4–6 business days · 24–48 h |
| Metal print with stress relief, then with CNC finishing | 5–8 business days · 8–12 business days |
| Repeats and short production lots | 1 pcs · 50–2,000 pcs / 5–10 business days |
| Build traceability | Material lot, powder refresh where relevant, build map, heat treatment or cure and inspection records. |
| Nonconformity and reprint | Confirmed manufacturing nonconformities receive a response within 24 hours and priority reprint, with expedited dispatch subject to process. |
| Item | Capability and conditions |
|---|---|
| Delivery terms by written agreement | EXW, FCA, FOB, DAP or DDP may be agreed for suitable shipments. Confirm schedule, quantity tolerance, packaging and acceptance window in the order. |
| Written approval for substitutions | Review grade, source, condition and recycled content against the drawing. Submit data sheets, compliance evidence and engineering impact for written approval before a substitution. |
| Engineering and process changes | Review customer drawing revisions in 24–48 hours, including stock, cost and first article impact. Agree notice window, verification and written release before major process changes. |
| NDA, access and records | Mutual NDA and restricted drawing access are available. Retention and destruction follow agreed project terms and regulatory requirements. |
Choose individual grades for the brief. Use the comparison to review the print process, batch controls and acceptance for each family.
Match IND405 or PRO476 to the validated vat platform. Evaluate ceramic-filled Somos PerFORM on compatible SLA when stiffness or heat testing matters.
Evaluate Nylon 12CF for directionally stiff tooling and ULTEM 9085 for elevated-temperature requirements. Review the selected printer, layup and service loads.
Review corrosion resistance, weight, strength and test requirements when choosing 316L, AlSi10Mg or a specific Ti-6Al-4V grade. Confirm the heat treatment and any final CNC machining.
Select a family or compare all four to see their batch and inspection requirements.
| Engineering criterion | Powder-bed polymers | Engineering photopolymers | Extrusion thermoplastics | Metal LPBF feedstocks |
|---|---|---|---|---|
| As-built linear tolerance | MJF ±0.20 mm (≤100 mm) / ±0.25% SLS ±0.25 mm (≤100 mm) / ±0.30% | SLA ±0.10 mm (≤100 mm) / ±0.15% | ±0.20 mm (≤100 mm) / ±0.20% | LPBF ±0.10 mm (≤100 mm) / ±0.15% |
| Typical production use | Nested housings, clips and manifolds | Fine-detail assemblies and clear prototypes | Jigs, assembly aids and large tooling | Load-bearing brackets and complex metal channels |
| What to record by build | Powder lot, refresh ratio and build positions | Resin lot, exposure platform and post-cure | Filament lot, layup, shell and drying settings | Powder history, build map and heat-treatment record |
| Key checks on finished parts | Clean cavities, fit after finishing and agreed seal checks | Critical features after post-cure and appearance sample match | Fit of inserts, joints and loaded features | Final datums and bores, plus agreed witness tests |
These are planning tolerances for the named print processes. Agree the grade, inspection state and finished drawing tolerances before series release.
Review the evidence needed to approve the baseline and release later batches.
Confirm the revision, critical interfaces, final finish and quantities by release.
Link feedstock lots to the build plan and record powder refresh where applicable.
Review dimensions and functional checks. Include witness specimens when specified.
Schedule cleaning, curing, heat treatment or machining according to the approved route.
Check agreed features and record deviations and their disposition before release.
Separate part numbers and protect finished surfaces. Add ESD packaging if specified.
Select the records you need. Confirm their format, test methods and availability for the selected resin and process.
Request a link between material lot, build ID and production batch.
Agree which features to record and which drawing revision governs release.
Define the sampling positions, measurement alignment and the report format.
Identify changes requiring written approval and the first-article checks to repeat.
Request applicable RoHS or REACH records and specify any NDA needed for shared drawings.
Attach the selected routes, material families, grades and inspection records to your CAD inquiry. Enter the quantity for the first shipment and give the forecast separately.
Process routes · DFM guide · Materials · Inspection and delivery
Select a route, material or record above, or enter the schedule or special requirements below.
No. It supports the questions it was made to answer. The production material, route, controls and acceptance plan must also be confirmed.
They may, when process and material requirements are compatible. Identification, finishing and delivery quantities still need to be managed separately.
Approved files, material and process, quantities, expected reorders, critical features, finishing, traceability, inspection records and packing requirements.