CNC machining quality and inspection

Before machining the first part, agree on the features, datums and condition for inspection.

Plan CMM, optical and surface measurements around the drawing. Agree first-article records, material traceability and lot acceptance with the manufacturing scope.

Coordinate measuring machine probe above a machined housing on a granite table
AS9102 FAIFirst-article forms available by agreement
EN 10204 3.1Material certificate when specified
Cpk ≥1.33 / ≥1.67Targets for agreed, validated features

Match the measurement method to the feature

Choose the setup, sensor or gauge around the tolerances and accessibility. Identify the required records at quotation.

Coordinate measuring machine (CMM)

Use tactile measurement for accessible datums and spatial relationships. Review probe reach and the locating setup for each part.

Optical vision measurement (VMM)

Use noncontact edge detection for suitable 2D features and delicate parts. Define lighting, orientation and the edge to be measured.

Stylus surface roughness measurement

Measure Ra or Rz at the specified location. Agree traverse direction, evaluation length, filtering and the required surface condition.

Bore instruments and functional gauges

Choose an air gauge, bore micrometer or limit gauge for the specified fit. Agree the measurement depths and the condition after unclamping.

Measurement methodTypical drawing featuresReview before measuringRecord for release
Coordinate measuring machine (CMM)Position, flatness and 3D profileDatum sequence, probe strategy and fixture distortionBallooned dimensional or GD&T report
Optical vision measurement (VMM)Slots, small holes and accessible contoursContrast, focus and edge selectionAnnotated 2D dimensions or optical comparison
Stylus surface roughness measurementSealing lands and sliding surfacesSurface direction and specified parameterRa/Rz readings and profile if requested
Bore instruments and functional gaugesBearing bores and thread fitCalibration, gauge fit and feature-level coverageBore readings or GO/NO-GO record

Three examples of critical feature inspection

Use the drawing to define the measurement state before agreeing how to inspect the feature.

Thin-wall frame in its specified support condition

For free-state inspection, support the frame without flattening it. For a restrained check, specify the fixture, locator positions and restraints on the drawing.

Datum bores after anodizing

Mark bores and threaded holes to mask. Inspect the final bore and mating fit after the specified coating process.

Optical check of a shaft relief and radius

Align the shaft to the specified axis and compare the projected transition with the drawing. Agree the magnification, profile edges and reference.

Inspection standards and sampling plan

Review drawing, reporting and lot acceptance requirements separately. Use the version of each standard agreed for your order.

Standard or controlReview before measuring
ISO 2768:2026 / ISO 2768-1:1989Apply the general tolerance class named on the drawing to the dimensions it covers. List functional fits separately.
ISO 1101 / ASME Y14.5Define the datum sequence, tolerance zone and free or restrained inspection state. Agree how the setup establishes the datum.
Surface texture specificationState the specified Ra or Rz parameter, limit and measurement location. Confirm the evaluation settings under the drawing standard.
CNC inspection, traceability and report options
ItemCapability and conditions
Raw material and identificationMTR / EN 10204 3.1 · PMI
First article and dimensional reportsAS9102 FAI Form 1/2/3 · CMM · VMM
Production process capabilitySPC / Cpk ≥1.33 · Cpk ≥1.67
Finish reports and batch documentationNSS · HRC / HV · Ra / Rz · COC · RoHS · REACH · CMRT
Supplier qualification documentationRequest applicable certificates by manufacturing entity and scope, calibration records and redacted report samples through the project audit.

Agree CTQs, measurement system, sampling and stability first. Higher Cpk targets apply only to validated features.

AQL sampling and inspection documents

Set lot size, inspection level, AQL and report package. If you have an approved normal single-sampling plan with integer acceptance counts, enter its sample size and Ac to calculate Re.

Approved sample size (n)
—
Acceptance / rejection (Ac / Re)
—
Report package
AS9102-format FAI + CMM

Confirm sample size and acceptance number for this order.

Use the approved edition and plan for sampling and release. Critical features may require a separate full-inspection plan.

Inspection inquiry brief ↓

Calibration, protection and lot traceability

Keep the gauge, drawing revision and lot identity traceable from inspection to shipment.

Reference checks and calibration evidence

Use suitable reference blocks or rings to check setup and zero. Verify valid calibration for the instruments used, and agree which records an audit requires.

Protected surfaces and lot labels

Protect finished threads, bores and cosmetic surfaces with suitable caps or compartments. Link the package label to the part lot and released drawing revision.

Six steps from incoming inspection to lot release

  1. Material and heat identification

    Match grade, stock and required certificates to the job. Record material and part-lot identifiers.

  2. Datum and ballooned drawing plan

    Define the measurement setup, feature numbers and probe or gauge access.

  3. First-article approval

    Record the agreed characteristics and resolve deviations before batch release.

  4. In-process checks

    Check critical features at the agreed frequency and respond to wear or dimensional drift.

  5. Final-condition reinspection

    Verify final dimensions, fits and appearance after the specified finish.

  6. Lot release and segregation

    Use the approved acceptance plan and hold nonconforming material pending disposition.

Send drawings and inspection requirements

Attach the selected measurement methods and report plans to the drawing inquiry. Include critical features and the required final inspection condition.

Inspection inquiry brief

Select a measurement method or add a sampling plan above.

Drawings & reference files

STEP/STP, PDF, JPG or PNG. Up to 3 files; 10 MB each, 20 MB total.

No files selected

    No drawing yet? Describe the part and application below.

    Quality and inspection FAQs

    Do I need to request a CMM or FAI report?

    Specify the required format, drawing revision and characteristics at quotation. The order defines the first-article, outgoing inspection and conformity records to include.

    How are critical bores checked after coating?

    Specify the drawing limits in the final state and mark any masked areas. Agree compensation, gauges and sampling coverage with the coating process.

    Can I request material and calibration records?

    Request EN 10204 3.1, heat traceability and the needed calibration records at quotation. For audits, agree the manufacturing entity, instrument scope and records available for disclosure.

    What happens when a feature is out of tolerance?

    Identify and segregate the affected lot, record measured values and review the disposition. Any concession requires the agreed written approval before shipment.