Cold-runner LSR molding
Review valve gates, cavity venting and shutoffs to control flash around sealing edges and small valve features.
Cold-runner LSR molding for wearable components, microfluidic valves and industrial seals. Share STEP or STP files and service conditions to review the gate, parting line and critical tolerances.
Choose the molding route based on sealing geometry, the substrate interface and how any inserts must be located in the tool.
Review valve gates, cavity venting and shutoffs to control flash around sealing edges and small valve features.
Match the silicone grade to the substrate and its cure-temperature limits. Decide whether to use a primer, a self-bonding grade or mechanical retention.
Define the insert datum, exposed areas and shutoffs first. Specify pull-out, torque or sealing checks to match the insert’s function.
| Selection factor | LSR | HCR | TPE / TPU |
|---|---|---|---|
| Molding and cure | Metered two-part injection and heat curing | Solid silicone charge pressed and cured in the tool | Thermoplastic melt injected and cooled |
| Dimensions and flash | Review the sealing edge, parting line and required tolerance class. | Check the parting line and allowance for trimming. | Account for shrinkage and warpage of the exact grade. |
| Thin walls and detail | Check gate location and venting at thin features. | Check charge placement and compression flow. | Check melt flow, draft and ejection. |
| Operating environment | Validate the selected grade against temperature and media. | Review the solid silicone compound and cure system. | Confirm grade-specific heat, oil and abrasion resistance. |
| Seal recovery | Check post-cure conditions and compression-set data. | Compare compression-set results for the cured compound. | Evaluate compression and creep over the actual duty cycle. |
| Cleanliness and documentation | Agree on the cleanroom class, batch traceability and grade documents. | Review preform handling, trimming and cleaning requirements. | Review compound-specific declarations and handling conditions. |
Compare actual grades and test conditions when you specify a tolerance, service temperature or compression set.
Use these examples to identify which dimensions, functional requirements and records belong on your drawing.
Agree on skin contact duration, surface finish, hardness and any biocompatibility documentation required for the chosen grade and finished part.
Specify opening pressure, leakage and cyclic life. Mark the slit, thin walls and sealing features that need verification.
Define gland dimensions, compression and demolding direction. When IP68 is a target, validate it on the assembled product under the specified test conditions.
Review venting, hardness and post-cure, sealing geometry, and grade-specific documentation before locking the mold design.
Uncured LSR can enter fine parting-line gaps. Review shutoff fit, vacuum venting and gate placement together, then agree on a flash limit for each critical area.
On the 2D drawing, mark seal lips, flash-sensitive edges and areas where a gate mark is acceptable.
Post-curing can reduce residual volatiles and affect final dimensions. Review the 150–200 °C and 2–4 hour process window against the grade, part and approval requirements.
For cushions, start with feel and contact pressure. For valves, check opening pressure and recovery. For seals, evaluate the required compression and service conditions.
Select a supplier series for initial review, then confirm the exact grade, lot identification, applicable CoA and any post-cure or testing required.
Review food-contact or biocompatibility documentation against the actual application. Define any test needed on the finished part in the inquiry.
Use these figures for an initial review. The approved drawing, process route and quote set the requirements for the part.
| Item | Capability and conditions |
|---|---|
| Available series | Elastosil LR 3003 / 3040 / 3070 / 3071 · Silastic LC-3330 / LC-3350 / QP1 · Silopren LSR 2000 / 2600 · Shin-Etsu KE-2000 |
| Hardness range and tolerance | Shore A 5–80 · Shore A 20–70 · ±3 Shore A |
| Colors and post-cure | Pantone / RAL · ΔE ≤ 1.0–1.5 · 150–200 °C × 2–4 h |
| Food and medical documentation by grade | 21 CFR 177.2600 · LFGB · USP Class VI · ISO 10993-5 / -10 / -11 · DMF |
| Cleanroom molding arrangements | ISO Class 7 / Class 8 |
Shore A 20–70 is the usual range. Agree color, cure schedule, cleanroom requirements and report coverage for the selected grade and part.
| Item | Capability and conditions |
|---|---|
| LSR presses | 50–250 tf · 15–450 g · 300 × 300 × 120 mm |
Rows show clamp force, shot mass and part envelope. Material, tool fit and usable shot size are evaluated together.
| Item | Capability and conditions |
|---|---|
| Selected LSR features | ±0.05–0.10 mm · ISO 3302-1 M1 |
| Conditioning and measurement | 23 ±2 °C · 50 ±5% RH · 24 h · VMM / CMM |
Ranges apply to selected parts and features. Agree size, resin, shrinkage and cosmetic master before FAI. DIN 16742 / ISO 20457 and ISO 3302-1 references follow the drawing and specified edition.
Agree on the inspection method and packaging conditions before production release, especially for soft parts that deform under contact pressure.
Use optical measurement for selected contours and apertures. Define Shore A hardness, tear strength or leak testing according to the part’s function.
Separate soft parts to protect seal lips from contact and deformation. Confirm the cleanliness level, packing method and batch label for the order.
Agree on gating, visible surfaces and which dimensions control assembly or function.
Set the cavity layout, shutoffs and venting based on the approved design.
Submit trial samples and the agreed inspection records for approval before batch production.
Tie incoming resin lot IDs to production records and deliver the agreed documentation and packaging.
Choose any known requirements and attach the brief to your inquiry. You can also upload drawings and leave the engineering choices open.
Start with the geometry, operating temperature, media and required recovery. Compare candidate grades under the same test conditions and select the process that meets both the drawing and batch requirements.
Review post-curing when the grade or application requires control of residual volatiles or final properties. Specify the required inspection state and testing with the engineering team before tool approval.
Check the exact substrate grade against the cure temperature and clamping loads. Use molded samples to validate adhesion and verify that the substrate stays within the required dimensions.
Send STEP/STP geometry and a 2D drawing marking critical tolerances and flash limits. Include target Shore A, trial and annual quantities, contact media, service temperature and required documents.