Functional housing with snap fits
Review PA12 or PA11 for housings and loaded clips. Specify insertion force, deflection travel and fit acceptance for repeat assembly.
Print functional polymer parts and short production runs without a mold. Plan powder removal, finishing and inspection around the final fit.
Send a STEP/STP model, estimated quantity and target grade. Mark the critical fits, load direction and surfaces that must be checked after finishing.
Compare part geometry, fit, finish and order size before deciding whether to print or tool the part. Scroll horizontally to see every process.
| Process routes | MJF | SLS | Injection Molding Services |
|---|---|---|---|
| Layer thickness | 0.08 mm | 0.10–0.12 mm | Molded in a tool |
| As-built linear tolerance | ±0.20 mm (≤100 mm) / ±0.25% | ±0.25 mm (≤100 mm) / ±0.30% | Set tolerance by geometry and drawing. |
| Load and orientation | Validate XY and Z properties for loaded clips and thin walls. | Review orientation and flexing with the specified powder. | Evaluate material flow, weld lines and the gate position. |
| Surface condition | Bead-blasted texture. Dyeing and vapor smoothing by grade. | Powder-bed texture and grade-specific color. | Tool texture, material and a reference sample. |
| Order and tooling considerations | Single parts and nested short runs without tooling. | Functional samples and repeat batches without tooling. | Tooling investment for recurring production. |
| Planning lead time | 2–4 business days · Typical polymer prototypes | 2–4 business days · Typical polymer prototypes | Plan tooling, first trial and part approval. |
Review quantities and lead times with the actual geometry, grade and finish. Molding tolerance and acceptance can be defined to ISO 20457:2026 when specified.
Add the example closest to your part to the engineering brief.
Review PA12 or PA11 for housings and loaded clips. Specify insertion force, deflection travel and fit acceptance for repeat assembly.
Plan accessible powder outlets in the curved channels. For a sealing application, agree pressure, medium, test duration and acceptance on the finished part.
Evaluate glass-bead PA12 GB. Review the boss wall and insert installation method, then set the inspection for mounting holes and torque or pull-out.
Tune the lattice for the required compression and rebound. Agree the TPU grade, hardness, load cycles and the minimum openings for powder removal.
Open each topic to see the drawing checks. Add the relevant items to the inquiry brief.
Plan outlets and access to check the cavity. Size the openings according to depth, turns and cleaning method. Through-hole dimensions in the capability table are manufacturing references.
Review long, thin faces for distortion during cooling. Use more uniform sections or suitable ribs where they help. Confirm the wall and flatness with the selected powder.
Mark the load direction and preferred cosmetic faces. Compare directional properties of the selected material and validate loaded snaps in the planned orientation.
Confirm dimensional change after blasting or smoothing. Selected features can target ±0.05 mm after suitable secondary work. Agree machining stock, access and the final measurement state.
Agree orientation, nesting and cooling for repeat runs. Record material lot, applicable powder refresh and finish. Specify conditioning or witness samples when the drawing calls for them.
Keep the build envelope and the recommended single-part size separate. Confirm dimensions and finish in the state delivered.
| Item | Capability and conditions |
|---|---|
| Materials by process | HP PA12 / PA12 GB / PA11 · BASF Ultrasint TPU01 · Estane 3D TPU M95A |
| One-piece build envelope | 380 × 284 × 380 mm · 350 × 260 × 350 mm |
| Layer thickness | 0.08 mm |
| Typical as-built linear tolerance | ±0.20 mm (≤100 mm) / ±0.25% |
| Selected features after secondary work | ±0.05 mm |
| Minimum wall, through hole and channel | 0.8–1.0 mm · Ø1.2–1.5 mm · 1.0–1.2 mm |
The first figure is the build envelope. The second is the usual recommended single-part limit to manage thermal distortion. Review powder removal from deep features.
| Item | Capability and conditions |
|---|---|
| Build direction review | Keep critical cosmetic faces away from supports where possible. Review hole orientation and XY/Z properties for loaded clips. |
| PA11/PA12 conditioning when specified | 50 °C · 70% RH · 1.5–2.5% |
| Heat, ageing and witness coupons | HDT 0.45 / 1.82 MPa · 85 °C / 85% RH · QUV · ASTM D638 / D790 |
| Item | Capability and conditions |
|---|---|
| MJF/SLS blasting, dyeing and smoothing | Ra 6.3–12.5 μm · 0.1–0.2 mm · Ra 1.5–2.5 μm |
| Single-side change after blasting or smoothing | 0.02–0.04 mm |
Compare five powder grades across four material groups. Add one grade to your brief, or ask engineering to review the selection.
Bead blasting, dyeing and smoothing produce different sheen and texture. Agree a finish sample and verify critical dimensions after finishing. Check TPU compatibility for any requested surface treatment.
General-purpose nylon for functional housings, manifolds and fixtures.
PA12 with 40% glass beads for stiffness and dimensional stability.
Ductile nylon for loaded snap fits and parts that need to flex.
Choose a grade by hardness, rebound and the required compression. Confirm printer and finishing compatibility for the chosen grade.
Ultrasint TPU01
Typical Shore A hardness · 88–90
ESTANE 3D TPU M95A
Typical Shore A hardness · 95
Manufacturer data are typical values from specific print and test setups. Use the selected grade and test orientation for acceptance. HDT and hardness describe different properties.
Confirm the post-processing and moisture-conditioning state before measuring critical features.
Check mounting holes, snap-fit gaps and flatness after finishing. Agree the alignment, coverage and reporting method if a deviation map is required.
Use dividers to protect thin or finished features. Specify moisture-barrier bags and desiccant where required and link the package to its material and build records.
The brief includes your selected part examples, material, design topics and finishing or inspection requests. Attach it to the inquiry with your CAD files.
Part examples · DFM guide · Materials
Select an option above, choose a finish below or add your requirements to generate a brief.
Compare the powder, visible finish, orientation and final fit for the part. Use the data for the selected grade and test loaded features in their intended orientation.
Specify the required test, sealing interfaces, medium, pressure or IP target. Evaluate smoothing as part of the finish and verify the assembled part under the agreed test conditions.
Show outlets at accessible locations and keep a path for cleaning and inspection. Review long, tight or curved channels and agree on any temporary openings before printing.
Review reaming, boring or inserts where the geometry and material permit. Identify the datums, final fit and required machining stock on the drawing.
Choose a reference sample and define the viewing conditions. Agree any abrasion or color transfer test and measure critical fits after finishing.
Use the approved drawing revision and finish reference. Review nesting, cooling and material conditions, and compare the first pieces to the prior accepted lot when required.