Skip to content

Production injection molding

Plan tooling, per-cavity inspection and delivery before releasing production.

Send STEP files, toleranced drawings, annual demand and the first-order quantity. We review draft, wall thickness, tooling economics and which dimensions and surfaces to verify.

Batch of molded housings in a tray beside a micrometer
50–1,300 tfThermoplastic press clamping range for review
10,000–500,000+Production quantity for planning
2–3 weeksRolling delivery schedule reference
SPI 101–105Tool life classes for planning

Choose a mold route by demand and assembly

Compare the mold investment, parts per cycle, runner waste and inspection scope for each route.

Precision single-cavity mold

For large housings or optical surfaces, one cavity lets you tune packing and cooling around one part. Confirm the part envelope and the finish sample.

Tool steel to evaluate
S136 / NAK80
Review priority
Polish, gate position and surface acceptance
Cost and cycle drivers
One part per cycle. Estimate tool cost from the cavity, side actions and finish, and include runner material if a cold runner is used.

Typical production part examples

These configurations show what to define for the material, molding route and acceptance plan.

Multi-pin connector housing

Consider glass-filled PA66 for detailed pins and latch features. Validate pin pitch, engagement and insertion force by cavity and use the agreed conditioning.

Mating halves for a portable instrument

In a family mold, check the two shells together for fit, seam height and appearance. Confirm where texture, gloss and color limits are measured.

Transparent sensor window

Review a suitable clear grade and polishable tooling. Agree thickness, transmittance, haze and permissible gate marks on the finished part.

Production tolerances, surfaces and tool life

General molded tolerances

Agree the applicable ISO 20457 provisions, dimension and nominal size from the drawing. Define conditioning and measuring method together.

Critical dimensions and process capability

Define tolerances and datums on the drawing. If Cpk is requested, agree the target, measurement adequacy, sampling by cavity and evidence of a stable process.

Polished and optical surfaces

Agree the SPI finish or reference sample for the mold surface. Define separate part criteria for gloss, haze or transmittance where applicable.

Matte and textured surfaces

Specify the VDI or texture reference, visible boundaries and draft. Verify appearance on the actual resin and color at trial.

Compare production resins and process checks

Filter by material family and choose a candidate grade for the brief. Check shrinkage, hardness and drying in the supplier data for the exact grade.

PC/ABS · SABIC Cycoloy C2950

Rigid amorphous thermoplastics

Review flow marks, color and dimensional consistency for housings. For a specified flame rating, verify the grade, color and tested wall thickness.

PC · Covestro Makrolon 2405

Clear PC and PMMA

Select the transparent version of the grade and use a finish sample. Specify the test thickness for haze and transmission and check gate whitening.

PA66+GF · Zytel 70G33L

Glass-filled engineering resins

Review fiber direction, weld lines and tool wear. Compare dimensions across cavities in the agreed conditioned state.

TPE · KRAIBURG TPE

Thermoplastic elastomers and soft interfaces

Match the exact TPE or TPU grade to the substrate and Shore hardness. For silicone, review the dedicated LSR process and cure conditions.

From cavity-level inspection to protected delivery

Agree inspection, sample identification and protection according to the drawing and delivery contract.

CMM and optical verification by cavity

Label samples by cavity and choose CMM or optical measurement for the agreed features. Set the sampling level and acceptance criteria before batch release.

Protective trays, ESD and moisture protection

Agree contact surfaces, bag or tray protection and lot labels. Add ESD protection or a moisture barrier where the part and transport require it.

Six stages from DFM to rolling deliveries

  1. Release drawings and process approach

    Resolve draft, wall transitions, gate position and dimensions that affect assembly.

  2. Build and inspect tooling

    Verify steel, inserts, runner and cooling against the approved tool design.

  3. T1 trial and first articles

    Identify samples by cavity and measure the agreed features before sample approval.

  4. Pilot run and parameter approval

    Review repeatability and set the reference sample, process window and inspection frequency.

  5. Controlled production and changes

    Track resin lot and cavity records. Verify and obtain written approval for material or process changes under the agreed rules.

  6. Pack and release rolling shipments

    Release each batch with the agreed packaging, labels, dates and shipment records.

Quality documents for this inquiry

Prepare a production brief and send drawings

Enter the resin, color, annual demand, first order and key requirements. Attach the brief after checking it against the drawing.

Production engineering brief

Submit drawings and project inquiry

Drawings & reference files

STEP/STP, PDF, JPG or PNG. Up to 3 files; 10 MB each, 20 MB total.

No files selected

    No drawing yet? Describe the part and application below.

    Questions before releasing production

    How do you check consistency across cavities?

    Review the runner, gate sequence and cooling in the mold design. At trial, identify samples and compare the agreed weight, appearance and critical measurements by cavity.

    Who owns the mold and what happens at its service-life limit?

    Ownership and handover follow the tooling contract. Before further runs, use the shot and maintenance records to review insert refurbishment, replacement or a new tool.

    What does first-article approval mean for later batches?

    The approved sample establishes a reference. Apply the agreed in-process and outgoing checks to later batches. If ISO 2859-1 sampling is used, agree the inspection level and AQL by defect class.

    How are resin substitutions approved?

    Submit the candidate grade, data sheet, compliance documents and impact review. Validate as agreed and obtain written approval before changing grades or regrind content.

    How do you estimate schedule and cost after an ECN?

    Review the revised drawing, existing inventory, cavities and sections affected by the change. Quote tooling work and revalidation before agreeing the switch date.

    KEEPWIN · LANGUAGE

    Choose your language

    Select the language you prefer for your visit.

    You can change your language anytime in the menu.