Plan tooling, per-cavity inspection and delivery before releasing production.
Send STEP files, toleranced drawings, annual demand and the first-order quantity. We review draft, wall thickness, tooling economics and which dimensions and surfaces to verify.
Batch of molded housings in a tray beside a micrometer
50–1,300 tfThermoplastic press clamping range for review
10,000–500,000+Production quantity for planning
2–3 weeksRolling delivery schedule reference
SPI 101–105Tool life classes for planning
Choose a mold route by demand and assembly
Compare the mold investment, parts per cycle, runner waste and inspection scope for each route.
Precision single-cavity mold
For large housings or optical surfaces, one cavity lets you tune packing and cooling around one part. Confirm the part envelope and the finish sample.
Tool steel to evaluate
S136 / NAK80
Review priority
Polish, gate position and surface acceptance
Cost and cycle drivers
One part per cycle. Estimate tool cost from the cavity, side actions and finish, and include runner material if a cold runner is used.
Multi-cavity hot-runner mold
For repeat demand, evaluate higher cavity counts with the runner balance, shot size and cooling. Use trial data to compare the weight and critical dimensions of each active cavity.
Tool steel to evaluate
8407 / Orvar Supreme
Review priority
Balance, cavity IDs and shot utilization
Cost and cycle drivers
Multiple parts per cycle. Compare lower cold-runner scrap with hot-runner investment, maintenance and the inspection load per cavity.
Family mold for matched sets
Evaluate a shared mold for matching halves that use the same grade and color. Compare demand ratios, spare parts and fit before locking the cavity layout.
Tool steel to evaluate
718H / NAK80
Review priority
Parts per set and changes by part number
Cost and cycle drivers
A shared tool can make several part numbers together. Include the cost of surplus parts if order ratios change.
2K molding and insert integration
Use a second material for grip or sealing, or mold around functional inserts. Agree which interfaces need peel, pull-out, torque or sealing tests.
Tool steel to evaluate
S136 / 8407
Review priority
Resin compatibility, insert location and shut-off
Cost and cycle drivers
Include extra injection or transfer steps and insert loading. Compare their cycle cost with the secondary assembly they replace.
Typical production part examples
These configurations show what to define for the material, molding route and acceptance plan.
Multi-pin connector housing
Consider glass-filled PA66 for detailed pins and latch features. Validate pin pitch, engagement and insertion force by cavity and use the agreed conditioning.
Mating halves for a portable instrument
In a family mold, check the two shells together for fit, seam height and appearance. Confirm where texture, gloss and color limits are measured.
Transparent sensor window
Review a suitable clear grade and polishable tooling. Agree thickness, transmittance, haze and permissible gate marks on the finished part.
Production tolerances, surfaces and tool life
General molded tolerances
Agree the applicable ISO 20457 provisions, dimension and nominal size from the drawing. Define conditioning and measuring method together.
Critical dimensions and process capability
Define tolerances and datums on the drawing. If Cpk is requested, agree the target, measurement adequacy, sampling by cavity and evidence of a stable process.
Polished and optical surfaces
Agree the SPI finish or reference sample for the mold surface. Define separate part criteria for gloss, haze or transmittance where applicable.
Matte and textured surfaces
Specify the VDI or texture reference, visible boundaries and draft. Verify appearance on the actual resin and color at trial.
1 / 2 / 4 / 8 / 16 / 32 / 64 cavities; family tools with adjustable flow and valve-gated hot runners as required.
SPI 101 / 102 / 103
≥1,000,000 · 500,000–1,000,000 · 100,000–500,000
SPI 104 / 105
10,000–100,000 · Al 5,000–10,000
Customer tool ownership and transfer
Customer ownership after payment as contracted, with drawings, asset identification, cycle counter, preventive maintenance and transfer support.
The listed cycle figures are planning ranges. Define the required life, resin and maintenance conditions when ordering the mold.
Match clamp force, usable shot size and platen fit to the tool and projected area. Set drying and mold temperature from grade data and validate at trial.
Molding quote and production schedule
Item
Capability and conditions
File check, standard and complex quotes
2–4 h · 24 h · 48–72 h
T1 dispatch and pilot run after approval
2–3 business days · 500–3,000 pcs / 5–10 business days
Quote timing starts with complete CAD, toleranced drawings, annual volume and resin or finish requirements. Confirm mold lead time and lot size per project.
Order controls and document handling
Item
Capability and conditions
Delivery terms by written agreement
EXW, FCA, FOB, DAP or DDP may be agreed for suitable shipments. Confirm schedule, quantity tolerance, packaging and acceptance window in the order.
Written approval for substitutions
Review grade, source, condition and recycled content against the drawing. Submit data sheets, compliance evidence and engineering impact for written approval before a substitution.
Engineering and process changes
Review customer drawing revisions in 24–48 hours, including stock, cost and first article impact. Agree notice window, verification and written release before major process changes.
NDA, access and records
Mutual NDA and restricted drawing access are available. Retention and destruction follow agreed project terms and regulatory requirements.
Compare production resins and process checks
Filter by material family and choose a candidate grade for the brief. Check shrinkage, hardness and drying in the supplier data for the exact grade.
PC/ABS · SABIC Cycoloy C2950
Rigid amorphous thermoplastics
Review flow marks, color and dimensional consistency for housings. For a specified flame rating, verify the grade, color and tested wall thickness.
PC · Covestro Makrolon 2405
Clear PC and PMMA
Select the transparent version of the grade and use a finish sample. Specify the test thickness for haze and transmission and check gate whitening.
PA66+GF · Zytel 70G33L
Glass-filled engineering resins
Review fiber direction, weld lines and tool wear. Compare dimensions across cavities in the agreed conditioned state.
TPE · KRAIBURG TPE
Thermoplastic elastomers and soft interfaces
Match the exact TPE or TPU grade to the substrate and Shore hardness. For silicone, review the dedicated LSR process and cure conditions.
From cavity-level inspection to protected delivery
Agree inspection, sample identification and protection according to the drawing and delivery contract.
CMM and optical verification by cavity
Label samples by cavity and choose CMM or optical measurement for the agreed features. Set the sampling level and acceptance criteria before batch release.
Protective trays, ESD and moisture protection
Agree contact surfaces, bag or tray protection and lot labels. Add ESD protection or a moisture barrier where the part and transport require it.
Six stages from DFM to rolling deliveries
1
Release drawings and process approach
Resolve draft, wall transitions, gate position and dimensions that affect assembly.
2
Build and inspect tooling
Verify steel, inserts, runner and cooling against the approved tool design.
3
T1 trial and first articles
Identify samples by cavity and measure the agreed features before sample approval.
4
Pilot run and parameter approval
Review repeatability and set the reference sample, process window and inspection frequency.
5
Controlled production and changes
Track resin lot and cavity records. Verify and obtain written approval for material or process changes under the agreed rules.
6
Pack and release rolling shipments
Release each batch with the agreed packaging, labels, dates and shipment records.
Prepare a production brief and send drawings
Enter the resin, color, annual demand, first order and key requirements. Attach the brief after checking it against the drawing.
Review the runner, gate sequence and cooling in the mold design. At trial, identify samples and compare the agreed weight, appearance and critical measurements by cavity.
Who owns the mold and what happens at its service-life limit?
Ownership and handover follow the tooling contract. Before further runs, use the shot and maintenance records to review insert refurbishment, replacement or a new tool.
What does first-article approval mean for later batches?
The approved sample establishes a reference. Apply the agreed in-process and outgoing checks to later batches. If ISO 2859-1 sampling is used, agree the inspection level and AQL by defect class.
How are resin substitutions approved?
Submit the candidate grade, data sheet, compliance documents and impact review. Validate as agreed and obtain written approval before changing grades or regrind content.
How do you estimate schedule and cost after an ECN?
Review the revised drawing, existing inventory, cavities and sections affected by the change. Quote tooling work and revalidation before agreeing the switch date.