Assorted printed metal, nylon and resin parts laid out on a workbench
2–6 hTypical standard quote time
2–4 business daysTypical polymer prototype lead time
50–2,000 pcsTypical repeat or short-run volume
Choose a build process for your part
Compare materials, geometry and finishing requirements across four process families.
Metal laser powder bed fusion
Review LPBF for conformal cooling, lattice structures and integrated metal parts. Check powder evacuation and support access. Plan stress relief and machining stock for critical interfaces.
The first envelope is standard. Larger configurations depend on the alloy, orientation, stress relief and distortion review. Tight feature values are after CNC finishing.
MJF and SLS for functional polymer parts
Unfused powder supports the parts, allowing nested batches without separate supports. Assess clip loads by build direction and check powder removal from recesses and channels. Specify color, texture and any sealing test.
The first figure is the build envelope. The second is the usual recommended single-part limit to manage thermal distortion. Review powder removal from deep features.
The first volume is standard; large builds are reviewed separately. Evaluate escape paths, part orientation and any finishing allowance.
SLA and multi-material PolyJet
Use SLA to review fine detail, transparent housings and appearance models. PolyJet combines compatible rigid and flexible photopolymers for fit and feel. Review support marks, cleanup access and long-term exposure.
The first volume is standard. WaterShed is a transparent photopolymer. PerFORM is ceramic-filled. Review supports, post-cure and local reaming separately.
Combine compatible rigid and flexible photopolymers for appearance or fit validation. Set final hardness and support access.
Material extrusion with engineering thermoplastics
Evaluate FDM for fixtures, larger housings and ducts. ASA, PC and ULTEM are candidate materials. Check toolpath orientation, chamber size, thermal distortion and the grade-specific service requirements.
Check polymer, layup and climate requirements with the selected chamber. Tight fit targets require compatible inserts or secondary work.
Compare industrial 3D printing parameters
Use these parameters for drawing review. The achievable fit depends on part geometry, orientation, material and final finishing. Scroll the table to see every column.
VeroClear · Agilus30 · Digital ABS Plus · Shore A 30–95
0.014–0.027 mm
±0.10 mm (≤50 mm) / ±0.15%
0.8–1.0 mm · Ø0.8–1.0 mm · 0.6–0.8 mm
490 × 390 × 200 mm
—
FDM
ABS-M30 · ASA · PC · Nylon 12CF · ULTEM 9085 / 1010 · Victrex AM 200
0.127–0.254 mm
±0.20 mm (≤100 mm) / ±0.20%
1.0–1.2 mm · Ø1.5–2.0 mm · 1.2–1.5 mm
914 × 610 × 914 mm
±0.05 mm
Sizes are process envelopes. Check the route-specific notes before planning a maximum-size part. Review heat deflection temperature for the exact grade and test load.
Browse materials and grades
Materials are grouped by build process. For printable silicone and specialized photopolymers, confirm the print platform and grade for the part.
Confirm the exact grade, stock form and requirements with your drawing before quoting.
Choose post-processing around the final fit and surface
Agree which surfaces will be exposed, threaded, sealed or finish-machined before the build.
Printed polymer samples and threaded metal inserts
Vapor smoothing and dyeing
For compatible MJF/SLS nylon, review Ra 1.5–2.5 μm after smoothing. Check dimensional change and confirm any water or air sealing by test on the finished part.
Polishing, paint and clear coat
For SLA and PolyJet, identify exposed surfaces and any accessible clear faces. Agree an appearance sample and a test method when clarity, UV ageing or adhesion is critical.
Threaded inserts
Choose the insert and installation method for the polymer and the anticipated load. Call out the pilot hole, remaining wall, thread and any pull-out or torque test.
Metal stress relief and CNC finishing
Check a 0.3–0.8 mm machining allowance for selected metal features. Set datums and machining access, then inspect sealing faces and critical fits after finishing.
Three part examples, from printing to finishing
Use these examples to specify what the finished part needs to do and what to inspect.
Conformal cooling manifold
For LPBF AlSi10Mg, plan powder evacuation and stress relief. Finish-machine the flange and seal groove and agree how to check the internal channels and final seal.
Short-run housings with snap fits
Nest MJF PA12 parts for a short run. Set the snap-fit and deflection targets, then inspect fit and color after depowdering and any dyeing.
Clear fluid-path prototype
Use clear SLA resin to observe flow. Review resin drainage and access for polishing. Set the acceptable transparency, channel sizing and any leak test around the intended use.
Inspect and trace the delivered parts
Define the measurement method, material records and packing at drawing review.
Printed components at the inspection and packaging station
CMM or 3D scan report
Measure datums and key holes against the drawing. For freeform surfaces, agree the scan alignment method and the areas for a deviation map.
Build traceability and CoC
Agree the material lot, applicable powder refresh, build position and relevant heat-treatment or cure records. Confirm the scope of the certificate of conformity (CoC).
Moisture and transport protection
Agree moisture protection for sensitive materials. Use individual supports or dividers for thin walls, sharp edges or finished visible surfaces.
Handling a confirmed nonconformity
Include the build or order number, drawing revision, photos and the affected measurements so engineering can identify the parts and scope.
3D printing quotes, lead times and traceability
Item
Capability and conditions
Standard and complex quotes
2–6 h · 12–24 h
Polymer prototypes, cosmetic finishing and expedited dispatch
2–4 business days · 4–6 business days · 24–48 h
Metal print with stress relief, then with CNC finishing
5–8 business days · 8–12 business days
Repeats and short production lots
1 pcs · 50–2,000 pcs / 5–10 business days
Build traceability
Material lot, powder refresh where relevant, build map, heat treatment or cure and inspection records.
Nonconformity and reprint
Confirmed manufacturing nonconformities receive a response within 24 hours and priority reprint, with expedited dispatch subject to process.
Configure a 3D printing inquiry and send drawings
Choose a process, post-processing and inspection options. Add the grade or critical requirements, then attach the brief to your drawing inquiry.
Build and finishing requirements
Your choices and entered requirements will appear here.
Layer height mainly affects the steps on sloped surfaces in Z. Review dimensional tolerance separately for shrinkage, warping, orientation and finishing. Consider machining stock for critical fits.
Can MJF or SLS parts bridge production before molding?
Review your snap fits, impact and fatigue loads, surface, and assembly conditions using parts from the intended process and grade. Pilot parts can support functional validation and the tooling decision.
How do you remove powder from internal channels?
Provide accessible escape and inspection paths. Engineers review opening size, bends, dead ends and cleaning methods for the process, powder and channel layout.
What should I send with a 3D printing request?
Send a STEP/STP solid model and a PDF drawing marking critical dimensions, threads, inserts and finish. For secondary CNC work, show datum and machining faces. State the grade, quantity and target delivery condition.