Skip to content

3D printing quality and metrology

Inspect parts in the condition in which they will ship. Define the final material state, critical dimensions and evidence needed for acceptance.

For SLA, SLS, MJF, FDM and metal LPBF, match CMM, scanning, gauges or material testing to the drawing and inspection plan.

CMM probe above a metal printed manifold on granite
99.5–99.8%Metal relative-density target by alloy and build
2–6 / 12–24 hStandard / complex quote response
24 hResponse after manufacturing nonconformity is confirmed

Choose a measurement method for each feature

Agree the datums, fixture state, equipment suitability and sampling before inspection.

Contact CMM

Verify machined datums, hole positions and coaxial features. Specify the datum scheme and access for the probe.

Blue-light optical scanning

Map profile deviation on visible freeform surfaces and thin housings. Specify CAD alignment, supports and surfaces to capture.

Metallography and surface roughness

Specify coupon section and sampling location for metallography. For Ra or Rz, agree the measurement direction and final surface condition.

Micrometers and limit gauges

Verify accessible thickness, bores and threads. Choose contact force and support for flexible parts, and state whether checks are sampled or performed on every part.

Acceptance planning by printing process

Use these reference values to review the drawing. The agreed inspection plan defines critical features and the final acceptance limits.

Feature or conditionReference for reviewTypical verification
Typical as-printed linear tolerance±0.10 mm (≤100 mm) / ±0.15%Calipers, CMM or scan as appropriate
Wall, through-hole and access-channel minima0.8–1.0 mm · Ø0.8–1.0 mm · 0.6–0.8 mmGauge, fit test or channel-access check
Selected features after secondary work±0.03–0.05 mmMeasure from agreed drawing datums
Final state for inspectionWash, post-cure and finish as specifiedRecord applicable processing and measure after it is complete
Process and material details

Polymer build orientation and validation
ItemCapability and conditions
Build direction reviewKeep critical cosmetic faces away from supports where possible. Review hole orientation and XY/Z properties for loaded clips.
Powder and resin cleaningMJF/SLS cooling, bead blasting, air and cleaning; SLA washing and controlled UV post-cure; PolyJet support removal per material.
PA11/PA12 conditioning when specified50 °C · 70% RH · 1.5–2.5%
Heat, ageing and witness couponsHDT 0.45 / 1.82 MPa · 85 °C / 85% RH · QUV · ASTM D638 / D790
Metal print post-processing and tests
ItemCapability and conditions
Relative density and associated tests99.5–99.8% target by alloy and build. Archimedes or metallography, tensile and hardness on build coupons, X-ray or CT where agreed.

Agree heat-treatment program, supporting coupons and documented acceptance on the drawing.

Prevent common additive manufacturing defects

These examples show what to specify before release, from sealing faces to hard-to-clean cavities.

LPBF · AlSi10Mg / 316L

Metal warpage and machined sealing faces

Agree stress relief for the chosen alloy and stock on the sealing and locating faces. Measure flatness and mounting features after machining. Agree a separate leak test when the assembly must seal.

SLA

Thin resin walls and masked fit features

Review support during cure and protect marked bores before coating. Inspect the span after cure and finish in the agreed free or supported state.

SLS / MJF · PA12

Residual powder and nylon conditioning

Identify blind bores and internal channels, make powder removal accessible and agree how to verify cleanliness. If conditioning is specified, measure after the target material state is reached.

Three levels of quality documentation

Select a starting scope for the inquiry. Confirm report contents, sampling and lead time for your drawing.

Quality documentation level

For functional prototypes, fixtures and small lots. Agree visual checks and sampling for the key dimensions.

  • Visual criteria
  • Key dimensions

For new parts or tight assemblies. Agree drawing feature coverage, datums and whether a CMM report or optical scan is appropriate.

  • Drawing-based FAI
  • CMM or 3D scan

For repeat builds or project-specific acceptance. Define material and build records, witness specimens and any agreed X-ray or CT scope.

  • Material and build records
  • Witness specimens and agreed tests

If aerospace first-article documentation is requested, specify the applicable revision and required deliverables. SAE AS9102C ↗

Six quality checks from drawing to repeat order

Link the material, process and acceptance records to the drawing revision. Reassess affected checks when the build or finish changes.

  1. Freeze drawings and review batch DFM

    Confirm the revision, critical interfaces, final finish and quantities by release.

  2. Set the material and build controls

    Link feedstock lots to the build plan and record powder refresh where applicable.

  3. Build monitoring and witness specimens

    Record the agreed orientation and build identification. Add witness specimens when the plan calls for material verification.

  4. Schedule builds and downstream operations

    Schedule cleaning, curing, heat treatment or machining according to the approved route.

  5. Review batch inspection and release

    Check agreed features and record deviations and their disposition before release.

  6. Pack and archive for repeat orders

    Archive the release record against the approved drawing and keep the lot identity with the shipment.

3D printing quotes, lead times and traceability
ItemCapability and conditions
Build traceabilityMaterial lot, powder refresh where relevant, build map, heat treatment or cure and inspection records.
Nonconformity and reprintConfirmed manufacturing nonconformities receive a response within 24 hours and priority reprint, with expedited dispatch subject to process.

Send drawings for inspection review and a quote

Attach a STEP or STP model and a toleranced PDF. Mark critical characteristics, surface condition and the records or tests you need.

3D printing inspection brief

Choose a process or a documentation level to prepare your brief.

Contact and CAD files

Drawings & reference files

STEP/STP, PDF, JPG or PNG. Up to 3 files; 10 MB each, 20 MB total.

No files selected

    No drawing yet? Describe the part and application below.

    FAQs

    Does fine layer resolution guarantee all dimensions?

    No. Orientation, geometry, material behavior, calibration and finishing also affect the result. Critical dimensions need an agreed tolerance and inspection method.

    Is a material coupon equivalent to testing the full part?

    No. It supplies evidence for its own specimen and conditions. The component’s geometry, interfaces and load cases may require separate checks.

    How do you avoid distorting thin or flexible parts during measurement?

    Agree whether to measure free, supported or installed. Use optical scanning for accessible surfaces where suitable, or specify the fixture and contact force for touch measurements.

    How are metal bearing bores and threads inspected?

    Define machining stock, fit and datum on the drawing. After CNC finishing, verify the bore with the agreed dimensional method and the thread with the specified gauge.

    What should I specify for an inspection report?

    Identify the drawing revision, measured features, datums, sample and batch identity, material condition and any functional test method and acceptance limits.

    KEEPWIN · LANGUAGE

    Choose your language

    Select the language you prefer for your visit.

    You can change your language anytime in the menu.