Combine machined, molded, printed and sheet metal parts to a released assembly specification. Agree component supply, fastening and insertion controls, functional checks and how sets are packed.
Torque setpoints for tooling review
0.05–5.0 N·m
Example gap target for the first unit
±0.10 mm
First assembly scheduling estimate
2–4 days
Confirm tooling, limits and schedule after the BOM, parts and inspection plan are agreed.
Gloved operator fitting components inside a metal enclosure at an assembly bench
Pre-assembly, kitting, turnkey supply and on-site assembly
Decide which interfaces to assemble, who supplies each component and where the final checks happen.
Engineering criterion
In-house pre-assembly
BOM kitting
Turnkey assembly
Customer site assembly
Suitable scope
Pre-fit connectors, harnesses and mixed-material interfaces that can be checked before delivery.
Pack by set if field adjustment or tool access is needed.
Review structural parts, purchased hardware and acceptance as one project.
Suitable when installation and final adjustment use the customer’s own line.
Fit and test responsibility
Approve a first assembly and retain agreed interface checks on the assembled unit.
Check kit contents; trial fit may be ordered separately.
Approve the configuration and agree which functional tests are part of release.
Incoming inspection and fit checks are split according to the project plan.
Parts and substitutions
Split manufactured, bought and customer-supplied parts in the BOM.
Set part numbers, quantities per kit and shortage rules.
Confirm supplier approval, substitutions and ownership of any long-lead item.
The customer controls stock, replenishment and assembly scheduling.
Packing and protection
Protect fitted connectors, painted faces and exposed joints.
Separate similar hardware by part number and count each kit.
Review the assembled unit’s support and identify the lot on the package.
Pack by item and agree how to protect critical features across shipments.
Assembly routes and engineering review
Pre-assembly and kitting split
Use pre-assembly for interfaces that can be inspected and tested before shipment. Keep site-installation parts loose if they need field adjustment or would block access. Set a packaging list by kit.
Freeze BOM and orientation, mark the items supplied by each party, and approve the packed set against a sample.
Torque fastening and press-in insertion
Confirm direction, engagement length and tooling clearance. Review threaded joints for torque and sequence, and press-in or snap connections for seating, force or retention as needed.
Check joint materials, screws and thread condition. Define torque verification and any separate locking feature. For press fits, agree the force and travel window and final seating height.
First unit, tolerance stack and gap
Assemble the actual mating parts in the specified sequence. Verify tooling access and check for collision, trapped wiring or uneven gasket compression.
Record gap and flushness at named points with agreed support and fixture conditions. Close any deviation before batch build.
Leak, continuity and motion checks
Agree the test fixture, medium, pressure, stabilization and dwell, along with the leak-rate or pressure-decay limit. Check continuity against the approved pin map.
For moving parts define travel, load, cycles and pass/fail conditions. Specify a separate enclosure protection test under IEC 60529 when required.
Assembly parameters and acceptance criteria
Switch between torque, press fitting, gap measurements and functional checks. Define limits on the actual assembly drawing and first-article plan.
Torque fastening
Typical use
Specify the joint, fastener grade, thread condition and the target torque in N·m. Review the selected tool at the required setpoint.
What to verify
Define tightening sequence and tool checks. Treat a witness paint mark as a visual indicator and verify the locking method and torque separately.
Press-in and snap-fit insertion
Typical use
Specify interference or snap engagement, insertion direction and allowable load. Confirm that the housing can support the force.
What to verify
Record peak force in N, travel or seating height in mm and, when required, the retention result. Inspect for cracks, tilt and incomplete seating.
Gap and flushness measurement
Typical use
Nominate a datum, support condition and points along each seam. Specify a gap and a flushness limit separately.
What to verify
A gap deviation such as ±0.10 mm can be evaluated on the first assembly. Use the agreed gauge and verify any critical point against the drawing.
Leak and electrical checks
Typical use
Define the intended function and test configuration. Use the agreed leak or electrical checks only within that configuration.
What to verify
Record pressure and dwell, continuity limits and sampling as applicable. Enclosure ingress protection requires its own test conditions.
What to verify
Test method
Drawing and acceptance requirements
BOM and component supply
Check part numbers and revisions against the approved BOM at incoming inspection. Sample according to the agreed plan.
Provide the assembly revision, part list and per-set quantities. Identify approved substitutions, customer-supplied parts and how shortages or revisions are handled.
Fastening and seating
Verify tool output against the intended setting and check the first assembled joint or fitted insert in its final state.
Specify torque in N·m with tool and fastening order, or insertion force in N and finished seating height. Verify on the first unit, with lot recording where required.
Fit and functional acceptance
Use a feeler gauge, depth gauge or optical method as suitable. Validate the agreed functional limits on the released configuration.
Measure gap and flushness at named points in mm in the specified support condition. Define latch engagement, orientation or continuity checks and sampling separately.
Traceability and packing
Use a pack-out checklist. For ESD-sensitive parts agree suitable handling and packaging, and verify labels and protection before release.
Map unit or lot identifiers to the BOM revision and inspection record. List loose parts and protect connectors, decorative faces and any ESD-sensitive items as specified.
Use these examples to identify the assembly interfaces, supplied parts and inspection record needed for your design.
Enclosure connectors, harness and clips
Verify routing, connector keying, latch and strain relief. Keep wires clear of cover edges and define the state of the cover and any continuity checks.
Mixed-material panel and perimeter seal
Check the gasket path and compression at corners, panel gap and access for fasteners. Trial on the actual machined frame and molded cover.
Counted hardware and installation kit
Separate visually similar hardware by thread, length or finish. Count against the released BOM revision and mark the bag or compartment.
Torque verification, incoming checks and protected packing
Tool verification and witness marks
Use an appropriate torque tester at the intended setting. Agree verification after start-up, adjustment or a tool change as needed; record results and use approved witness paint where requested.
Incoming inspection and revision control
Match supplier part numbers, revisions and quantities to the BOM. Check agreed visual or dimensional features and segregate shortages, mismatches and unapproved alternates.
ESD and interface protection
For sensitive parts, agree ESD handling and suitable packaging. Use protective caps or separated compartments where appropriate and make the lot traceable after packing.
From BOM review to lot release
BOM and supply review
Freeze BOM, supply responsibility and delivery state.
Fixture verification and trial build
Review locating fixtures, tool access and installation sequence.
2–4 days · First assembly scheduling estimate
First-article and functional approval
Approve the first assembled unit and the agreed test limits.
Batch assembly and kit release
Link lot records to the packed kits and release.
5–10 days · Batch assembly scheduling estimate
Frequently asked questions
Can customer-supplied components be included?
Provide the model, revision, quantities and incoming check plan. Agree the handling of shortages and substitutions before starting assembly.
How is the first assembly approved?
Approve mating fit, orientation, cosmetic condition and any defined functional checks against the specified revision. Record deviations before batch release.
Does a pressure leak check establish IP67 or IP68?
Agree pressure, hold, test medium and leak limit for production screening. When an IP rating is required, separately verify the complete enclosure under IEC 60529 and the project conditions.
Can standard parts be sourced for assembly?
List the manufacturer, part number, finish and permitted equivalent for each purchased item. Confirm procurement, availability and approval of alternatives in the quote.
What if mixed-process parts interfere at trial build?
Record the affected datums, measurements and assembly revision. Review an approved change to geometry, sequence or tooling and repeat the affected checks before release.
How are similar fasteners kept apart in kits?
Assign one identified compartment or bag per part number. Verify thread and length where risk warrants, and reconcile counts with the BOM revision before sealing.
Send drawings for engineering review
Send the assembly drawing, approved BOM and batch size. Include supplied items, tightening or insertion requirements and checks required at release.
Engineering review brief
Choose a process focus and describe the critical requirements. Your choices will be included in the enquiry.