PROJECT GUIDE / AUTOMOTIVE RFQ

Automotive project guide. Build a release package that survives the handoffs.

Use the enquiry to resolve who owns the files, what the samples demonstrate and what the buyer expects before shipment. Keep open issues visible as the project moves from development to repeat orders.

KeepWin coordinates partner-supported review. Exact material, responsible operations, process availability, dimensions, inspection, commercial quantities and timing are confirmed in the project proposal; no universal capability or certification is promised.

Illustrative generated example: Illustrative Generic automotive development components: a compact machined aluminum sensor mounting block, a black polymer sealed connector shell and a separate copper busbar with two mounting holes
Illustrative generated reference · Design reference · Automotive

Generated component concept for planning discussion, not a customer programme, approved component or measured result.

PackageControlled files and variants
DecisionsSamples and hold points
RepeatRecords and approved changes

01 / RFQ PACKAGE

Make the governing definition easy to identify.

Multiple attachments can describe different revisions or states. Build a concise register that tells the reviewer what controls geometry, material, finish and acceptance.

File register

List model, drawing, specification and reference files with revision and purpose. State units and precedence when information differs.

Variant matrix

Connect each configuration to quantities, component identities and distinguishing features. Identify common and variant-specific requirements.

Open-issue list

Separate confirmed requirements from decisions still awaiting buyer approval. Name the owner and the effect each issue has on quotation or release.

02 / SUBMISSION PLANNING

Ask for the buyer requirements before assuming the document set.

A generic dimensional report may not meet a programme submission. Agree the required scope and responsible source during review.

RFQ packageFiles & variantsSample gateChecks & ownerOrder releaseRecords & packKeep decisions linked to the released configuration
Engineering illustration, not to scale. No measured result or universal process limit is shown.

Buyer format

Supply the actual requested submission or inspection format. Confirm required data, signature responsibility and represented configuration.

Operation map

Identify which party supplies material, tooling, manufacture, finish and final checks. Ask which responsible entity prepares each record.

Acceptance map

Link important characteristics to methods, state and sampling. Keep application approval separate from routine dimensional or appearance checks.

Commercial boundaries

Clarify whether submission preparation, additional samples and external testing are included. No certification or buyer approval is promised by default.

03 / SAMPLE GATES

Use each sample to close a stated decision.

Development samples are more useful when their limitations and next decisions are recorded. Do not treat a favourable review as an undefined production release.

Use each sample to close a stated decision.
GateReviewRelease condition
Concept reviewShape, access or assembly idea.Record questions and unrepresented properties.
Manufacturing sampleOffered material and operation chain.Agree checks and configuration identity.
Buyer submissionRequested evidence and criteria.Approval owner and remaining actions.
Repeat-order reviewChanges since earlier approval.Confirm continued applicability or new checks.

04 / CHANGE LOG

Record what changed and why before extending approval.

File, tooling, material and site changes can affect different evidence. A visible log makes the new review scope easier to agree.

Revision change

Identify affected features and documents. Prevent obsolete files from remaining active in the released package.

Route change

Record changed process, tooling or site and ask which prior checks remain representative. Confirm responsible approval.

Material change

Document exact old and proposed specification and condition. Do not treat a family name as equivalent supply.

Deviation control

Define the affected quantity and proposed disposition. Keep temporary acceptance separate from a permanent drawing change.

05 / DELIVERY PACKAGE

Prepare identity and protection before shipment.

Part labels, packing and records should follow the approved variant and delivery scope. The transport plan is part of the deliverable.

Prepare identity and protection before shipment.
ItemDefineConfirm
IdentityPart/revision, variant and requested lot references.Correct relationship between parts and records.
ProtectionContact, coating and deformation-sensitive areas.Agreed packing and handling method.
DocumentsRequested report or submission set.Configuration, coverage and responsible issuer.
ShipmentQuantity, destination and delivery assumptions.Milestones and included logistics scope.

06 / RFQ CHECKLIST

Expose assumptions before selecting an offer.

Compare quotations using the same files, sample gates and document requirements. An unexplained gap can become a later release delay.

Before requesting price

Resolve controlling files, materials, final state, quantities and programme requirements. Attach relevant buyer formats and identify open decisions.

Before approving samples

Record the sample identity, represented questions, results and limitations. State whether approval permits preparation, manufacture or shipment.

Before repeating an order

Check changed files, material, tooling, operations and packing against earlier approval. Confirm milestones and applicable evidence instead of copying an old price alone.

07 / QUESTIONS

Questions before an automotive RFQ release.

The package should show both technical requirements and decision ownership.

Must every programme use the same submission?

Requirements depend on the buyer and project. Supply the actual requested scope and confirm applicability.

Who controls file precedence?

The buyer should identify the governing definition and approve conflict resolution before work is released.

Can sample approval cover all variants?

Only the represented and agreed scope. Explain shared features and variant-specific checks before extending a decision.

Can an old quotation be repeated unchanged?

Reconfirm files, quantities, material, route, evidence and delivery conditions. Review changes against the previous approval.

Does this guide promise programme approval?

No. It organizes the project inputs and responsibilities; applicable buyer release remains a separate decision.

PREPARE THE NEXT DECISION

Send the RFQ package and its unresolved decisions.

Include a file register, governing drawing/model, variant quantities, buyer quality requirements, sample plan, approval contacts, packing instructions and requested milestones.

sales@keepwinco.com

An enquiry starts a team review. Material, fit, quantity, schedule, operation responsibility and supporting records are confirmed in the proposal; this form does not create an order or an instant price.

Start with what you know. Review your details before sending; no account needed.

Start parts inquiry →

Your project is saved securely only when submission succeeds.

Continue your project review

General material context only; external references do not certify a finished KeepWin product.